ML20129H190

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1985
ML20129H190
Person / Time
Site: Cooper 
Issue date: 03/31/1985
From: Salisbury J, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CNSS850145, NUDOCS 8506070505
Download: ML20129H190 (5)


Text

OPERATING DATA REPORT DOCKET NO. 50-298 DATE 4-3-85 COh!PLETED BY J.K. Salisbury TELEPHONE 402-825-3811 OPERATING STATUS

1. Unit Name:

Cooper Nuclear Station Notes March, 1985

2. Reporting Period:

2381

- 3. Licensed Thermal Power (31W ):

4. Nameplate Rating (Gross htWe):

836 778

5. Design Electrical Rating (Net StWe):

787

6. Af aximum Dependable Capacity (Gross 31We):
7. Afaximum Dependable Capacity (Net alWe):

764

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To which Restricted.lf Any (Net 51We):
10. Reasons For Restrictions.If Any:

This hionth Yr.-to.Date Cumulative

11. Hours In Report:ng Period 744.0 2,160.0 94.249.0
12. Number OfIburs Reactor Was Critical 0.0 0.0 72,955.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 0.0 0.0 71.820.6
15. Unit Reserve Shutdow.1 Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (5tWH) 0.0 0.0 141,440,011.0
17. Gross Electrical Energy Generated (htWH)
0. 0,,

0.0 45,024,496.0

18. Net Electrical Energy Generated (51WH) 0.0 0.0 43,386,612.0

' 19. Unit Service Factor 0.0 0.0 76.2

20. Unit Availability Factor 0.0 0.0 76.2
21. Unit Capacity Factor (Using SIDC Net) 0.0 0.0 60.3
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 5 9. 2_ __ _

.23. Unit Forced Outage Rate 0.0 0.0 3.7

' 24. Shutdowns Scheduled Over Next 6 Stonths(Type. Date,and Duration of Eacht:

1984 Refueling and Maintenance Outage starting September 16, 1984, with an aonroximate 9 month duration.

-25. If Shut Down At End Of Report Period. Estimated Date of Startup:

June 15, 1985

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY CO31.\\lERCIAL OPER ATION m"TJ882 838%

R PDR Vn - l

c..

-.c 4

'4 y

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-298 US UNIT DATE

~

~

_ COMPLETED BY

-J.K. Salisbury 402-825-3811 TELEPiiONE MONTI{

March. 1985

~

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe-Net I (MWe-Net)

, D ~

0

~ ~ ~ ~

g 2

n 3

o 3

. ~g...-

-.--g-..._...

4 0

20 0

5 0'

23 0.

6 0

0 33 0

0 7

.S.

~

0 0'

24 9-0 0

25 0

10 26 11 0

27 0

12 0

'0

3 13 n

29 o

14 0

30 0

IS -

0 0

y, 16-n i

INSTRUCTIONS

.On this farmat. list the average Ja:!y umt power levelin MWe Net for each day in the tcportine month. Compute to the nearest whole me;2 wait.

i (4 /77 )

6 1

+

UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

50-298 CNS UNIT N AME DATE 4-3-85 COMPLETED BY J.K. Salisbury REPORT MONTil March, 1985 TELEPilONE 402-825 1811 e.

E E

,$g 3

yIE Licensee

,E r, g"3 Cause & Corrective Action to No.

Date g

3g 4

.E s 5 Event 3,7 gu Psevent Recurrence H

yE 5

5 dj y Report #

mO o

u Q

(bone during th is repo rting period) l i

"1 s

i l

l I

2 3

4 i

F: Forced Reasorl:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for, Preparation of Data B. Maintenance or Test 2-Manual Scram.

Ertry Sheets for Licensec C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Reg 61atory Rest:iction 4-Other (Explain) 0161)

E-Operator Training & License Examination F. Administrative S

G-Operational Error (Explain)

Exhibit I-Same Source C1/77)

Il Other (Explain)

L

r Operations Narrative Cooper Nuclear Station March, 1985 The plant remained shutdown in the month of March for the 1984 Refueling and Maintenance Outage.

e-N

+

9 F

COOPER NUCLEAR STATION P.o. box 98, BRoWNVILLE, NEBRASKA 68321 Nebraska Public Power Distr. t ic TELEPsoNE i o2> 2

-2.i>

CNSS850145 April 3, 1985 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operation Status Report for March 1985 Docket No. 50-298 Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for March 1985. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data, and a Narrative Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact me.

Sincerely, Y

d P. V. Thomason Division Manager of Nuclear Operations PVT:lb Enclosure cc:

G. D. Wa. son w/ enc.

A. C. Gehr w/ene.

R. D. Martin w/ene.

il 1