ML20129G531
| ML20129G531 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/31/1985 |
| From: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20129G535 | List: |
| References | |
| CON-#385-295 SP, NUDOCS 8506070303 | |
| Download: ML20129G531 (5) | |
See also: IR 05000289/1985099
Text
e
4 ->
-
..
s1' -
._
,
.
t
/
MAY 311986
.
Docket No. 50-289
,_
[GPUNuclearCorporation
,
ATTN: Mr. H. D. Hukill
Vice President and -Director of THI-1
P. O. Box 480
Middletown, Pennsylvania 17057
Gentlemen:
Subject:
Systematic Assessment of Licensee Performance - Report No.
50-289/85-99
This refers to the Systematic Evaluation of Licensee Performance (SALP) at
Three Mile Island, Unit No. 1 for the period February 1984 through January
1985, initially forwarded to you .by our April 2,1985 letter (Enclosure 1).
This SALP evaluation wu discussed with you and the GPUN staff at a meeting
held in the Region I facilities on April 11,1985 (see Enclosure 2 for attend-
ees).
We have reviewed your May 7,1935 written comments (Enclosure 3) and
have made appropriate minor changes as identified in the enclosed report
(Enclosure 4).
-
Our overall assessment was .aat your staff's management continued to be
aggressive in problem resolution and involvement in promoting nuclear safety
and radiation protection.
We found improvement in shutdown plant operations,
improving from a Category 2 last assessment period to a Category 1 this assess-
ment, and continuing performance difficulties in the engineering and licensing
areas; both areas apprised Category 2.
We caution your management to remain
sensitive to factors affecting performance during changing plant operational
modes.
We acknowledge your comments on Section IV.A, Shutdown Plant Operations, and
Section IV.I, Licensing Activities, and have made corrections to clarify the
total number of Senior Reactor Operator candidatus and the source of Technical
Specification change requests necding. more attention to the significant hazard
consideration determinations. Thr.se corrections are identified with a vertical
line on pages 10c (corrected), 23c and 29c. We note your increased management
attention on: (1) assuring consistency among procedures and addressing
programmatic requirements; (2) developing n.aintenance philosophy on quality
while the quality control list is being developed; (3) implementing tne modi-
fications task force recommendations and an improved process of handling modi-
fications; and (4) coordinating the 'backlpg of licensing issues with NRR.
No reply to this letter is needed. 'loor actions in response to the SALP will
continue to be reviewed during f_uture inspections of the facility.
A
9
,
t i
fllD
t
&
p
,.
_
GPU Nuclear Corporation
2
Your cooperation with'us is appreciated.
Sincerely,
Origrnal 31'gned by
ThomasI.Murlet
Thomas E. Murley
Regional Administrator
Enclosures:
1.
NRC Region I letter, T. Murley to H. Hukill,
April 2, 1985.
2.
SALP Meeting Attendees
3.
GPUN letter, H. Hukill to T. Murley,
May 7, 1985.
4.
SALP Inspection Report 50-289/85-99
cc w/ enc 1s:
R..J. Toole, Operations and Maintenance Director, TMI-1
C. W. Smyth, Manager, TMI-1 Licensing
R. J. McGoey, Manager, PWR Licensing
G. F. Trowbridge, Esquire
TMI-1 Hearing Service List
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
Chairman Palladino
Commissioner Roberts
Commissioner Asselstine
Commissioner Bernthal
Commissioner Zech
bec w/encls:
Region I Docket Room (with concurrences)
W. D. Travers, Deputy Program Director, TMI Program Office
J. Goldberg, OELD: HQ
J. Taylor, IE
R. Starosteckt, Director, DRP
W. Kane, Dep. Dir., DRP
Senior Operations Officer (w/o encis)
Director, DRS
Director, DRSS
0FFICIAL' RECORD COPY
102 CONNER 5/15/85 LETTER - 0001.1.0
05/15/85
,
__.
.
..
-
-_
-
..
... - - .
m
- 1
'GPU Nuclear Corporation
3
bec w/encls (cont'd.)
PA0(2)
DRP Section Chief
DRP-SALP File
/W
..J
I[ RP
(I:ERP
R ':DRA
itI:RA
nf
dt tros'eur
Y1
hey
S
tecki
M l
g
Kisted
o
I-
'
OFFICIAL RECORD COPY
102 CONNERS /15/85 LETTER - 0002.0.0
05/15/85
l
L
~
.
OperatiFns
19
'
50-289
.
TMI-I Hearing Service List
Administrative Judge
Administrative Judge
Gary J. Edles, Chairman
Ivan W. Smith, Chairman
Atomic Safety & Licensing
Atomic Safety & Licensing Board
Appeal Board
U. S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission
Washington, D.C.
20555
Washington, D.C.
20555
Administrative Judge
Michael W. Maupin, Esquire
John H. Buck
Hunton & Williams
Atomic Safety & Licensing Appeal Board
707 East Main Street
U.S. Nuclear Regulatory Commission
Post Office Box 1535
Washington, D.C.
20555
Richmond, VA 23212
Administrative Judge
Administrative Judge
Christine N. Kohl
Gustave A. Linenberger, Jr.
Atomic Safety & Licensing Appeal Board
Atomic Safety & Licensing Board
U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission
Washington, D'.C.
20555
Washington, D.C.
20555
Atomic Safety & Licensing Board Panel
Administrative Judge
U.S. Nuclear Regulatory Commission
Sheldon J. Wolfe
Washington, D.C.
20555
Atomic Safety & Licensing Board
U.S. Nuclear Regulatory Commission
Washington, D.C.
20555
Docketing & Service Section (3)
Atomic Safety & Licensing Appeal
Office of the Secretary
Board Panel
U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission
Washington, D.C.
20555
Washington, D.C.
20555
Mr. Henry D. Hukill
Jordan D. Cunningham, Esquire
Vice President
Fox, Farr & Cunningham
GPU Nuclear Corporation
2320 North Second Street
Post Office Box 480
Harrisburg, PA 17110
Middletown, PA 17057
Michael F. McBride, Esquire
Ellyn R. Weiss, Esquire (1)
LeBouef, Lamb, Leiby & MacRae
Harmon, Weiss & Jordan
1333 New Hampshire Avenue, N.W.
2001 S. Street, N.W.
Suite 1100
Suite 340
,
Washington, D.C.
20036
Washington, D.C.
20009
'
Ms. Louise Bradford
Mr. Steven C. Sho11y
TMI ALERT
1011 Green Street
1346 Connecticut Avenue, N.W.
Harrisburg, PA 17102
Dupont Circle Bldg., Suite 1101
Washington, D.C.
20036
l
-
l
l
'
-
-
Operatirns
19
'
'
50-289
Chauncy Kepford
Judith H. Johnsrud
Environmental Coalition on Nuclear Power
433 Orlando Avenue
State College, PA 16801
Lynne Bernabei, Esquire
William S. Jordan, III, Esquire
Government Accountability Project
Harmon, Weiss & Jordan
1555 Connecticut Avenue, N.W.
2001 S Street, N.W.
Washington, D.C.
20009
Suite 430
'
Washington, D.C.
20009
Ms. Frieda Berryhill, Chairman
Coalition for Nuclear Power Plant
Postponement
2610 Grendon Drive
Wilmington, Delaware 19808
Mr. Thomas Gerusky
Judge Reginald L. Gotchy
Bureau of Radiation Protection
Atomic Safety and Licensing
Department of Environmental Resources
Appeal Board
P.O. Box 2063
U.S. Nuclear Regulatory Commission
Harrisburg, Pennsylvania 17120
Washington, D.C.
20555
Thomas Y. Au, Esquire
Dr. Lawrence R. Quarles
Office of Chief Counsel
Atomic Safety and Licensing
. Department of Environmental Resources
Appeal Board-
P.O. Box 2063
U.S. Nuclear Regulatory Commission
Harrisburg, Pennsylvania 17120
Washington, D.C.
20555
.
Mr. Marvin I. Lewis
Ms. Jane Lee
6504 Bradford Terrace
RD 3, Box 3521
Philadelphia, Pennsylvania 19149
Etters, Pennsylvania 17319
Mr. C. W. Smyth, Manager
Allen R. Carter, Chairman
-Licensing, TMI-1
Joint Legislative Committee on Energy
Three Mile Island Nuclear Station
Post Office Box 142
P.O. Bor 480
Suite 513
l
Middletown, Pennsylvania 17057
Senate Gressette Building
Columbia, South Carolina 29202
l
l
.
t
, -
. - . .
._.
/'se n:vq'o
UNITED STATES
Enclosure 1
' , ,
E *'
NUCLEAR REGULATORY COMMISSION
. , . .
o
'
I
CE0lON 1
d',-
-
Q
631 PARK AVENUE
Sg
KING OF PRUs5IA, PENNSYLVANIA 1M06
Docket No. 50-289
2M
GPU Nuclear Corporation
ATTN:
Mr. H. D. Hukill
Vice President and Director of TMI-1
P. O. Box 480
Middletown, Pennsylvania
17057
Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP)
The NRC Region I SALP Board has' reviewed and evaluated the performance of
activities at the Three Mile Island Nuclear Station - Unit 1 for the period
February 1984 through January 1985. The results are contained in the enclosed
report dated March 13, 1985.
A meeting to discuss this assessment has been
scheduled on April.11,1985.
This meeting will be held in the Region I Office,
King of Prussia, Pennsylvania.
This SALP addresses the time period which included completion of modifications
and those activities associated with preoperational testing.
As such, several
functional areas were added to this SALP in order to perform a more encompassing
assessment.
At the SALP meeting, we request that you be prepared to discuss our assessment
and to address those areas warranting improvement. The meeting is intended to
be-a dialogue wherein any comments you may have regarding our report may be
discussed. A written response addressing such items is requested within 30
days of the meeting.
,
Your cooperation with us is appreciated.
j
Sincerely,
-
Thomas E. Murley
-
'
Regional Administrator
Enclosure:
As stated
.
.
W
-
l
- .
.-
-
-
t'
l
I.
Enclosure 2
TMI-1 SALP ATTENDEES
April 11, 1985
i
GPUN.
,
P. Clark,. President
R. Fasulo, Vice President, Administration.
R. Heward, Vice President, Radiological and Environmental Controls
H. Hukill, Vice President and Director, TMI-1-
R. Long, Vice President, Nuclear Assurance
L
'
R. McGoey, PWR Licensing Manager
L. Robinson, Communications Representative
C. Smythe, TMI-1 Licensing Manager
l
R. Wilson, Vice President, Technical Functions
NRC
J. Stolz, Chief, Operating Reactors Branch No. 4, NRR
- O. Thompson, Operating Reactors Project Manager (TMI-1), NRR
-T. Murley, Regional Administrator
J. Allan, Deputy Regional Administrator
,
R.- Starostecki, Director, Division of Reactor Projects
'
l'
S.-Ebneter, Director, Division of Reactor Safety
l -
W. Kane, Deputy Director, Division of Reactor Projects
-H. Kister, Chief, Projects Branch No. 1, Division of Reactor Projects
E. Conner, Chief,- Projects Section No.1A, Projects Branch No.1, DRP
R. Conte, Senior Resident Inspector (TMI-1)
<
(
i
l-
~
L
!.