Text
o 33
)
- Corr cted s
OPERATING DATA REPORT DOCKET NO.
50-260 DATE 3-1-85 COMPLETED BY T-N TELEPilONE.(205) 729-2509-OPER ATING STATUS
- l. Unit Name:
Unit 2. Browns Ferry N"'"
- 2. ileporting Period:
February 1985
- 3. Licen>cd Thermal Power IMWil: 3293
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Masimum Dependable Capacity (Gross MWe):
1098.4 1065 i Masimum Dependable Capacity (Net MWe):
h if Changes Occur in Capacity Ratings (items Number 3 Through 7p Since Last Report,Give Reasons:
N/A
- v. Power Lesel To Which Restricted.If Any INet MWe):
N/A 10 R.wms For Restrictions. If Any:
N/A This Month Yr..to.Da te Cumularise i
i1. Ilours in Reporting Period 672 1416 87.703
- 12. Number Of Hour Reactor Was Critical 0
,_0 55,860.03
- 13. Reactus* Resene Shutdou n iour, 0
_0
__L4,200. 44
~
- 14. llours Generator On.Line O
n
_ sa _ qu.1g
- 15. Unit Resene Shutdown floun 0
0 0
- 16. Grow Thermal Energy Generated (MWH) 0 0
151: 24 5.1 A7 17 Grow Electrical Energy Generated (MhHi 0
0 50.771.708
- 18. Net Electrica! Energy Generated lMWH)
-2,609
_-5,704 49,297,269
- 19. Unit Senice Factor 0
0 62.0 0
0 62.0
- 20. Unit Asailability Factor
- 21. Unit Capacity Factor IUsing MDC Net) 0.
0
- 52.8 0.
0
- 52.8 2.'
Unit Caiueity FactorIUsing DER Net) 0 0
23.0
- 23. Unis Forced Outage Rate
- 24. Shutdowns Scheduled rner Next 6 MonthsIType.Date,and Duration of Eacht:
- 25. If Shus Down At End Of ileport Period. Estimated Date of Startup:
August 1. 1985
- 26. Units in Test Status tPrior to Commercial Operationn Forecast Achiesed 4
, INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8506070243 850419 PDR ADOCK 05000259 R
("/771 2
....