ML20129G369

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Feb 1985
ML20129G369
Person / Time
Site: Browns Ferry  
Issue date: 02/28/1985
From: Thom T
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20129G244 List:
References
NUDOCS 8506070243
Download: ML20129G369 (1)


Text

o 33

)

  • Corr cted s

OPERATING DATA REPORT DOCKET NO.

50-260 DATE 3-1-85 COMPLETED BY T-N TELEPilONE.(205) 729-2509-OPER ATING STATUS

l. Unit Name:

Unit 2. Browns Ferry N"'"

2. ileporting Period:

February 1985

3. Licen>cd Thermal Power IMWil: 3293
4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Masimum Dependable Capacity (Gross MWe):

1098.4 1065 i Masimum Dependable Capacity (Net MWe):

h if Changes Occur in Capacity Ratings (items Number 3 Through 7p Since Last Report,Give Reasons:

N/A

v. Power Lesel To Which Restricted.If Any INet MWe):

N/A 10 R.wms For Restrictions. If Any:

N/A This Month Yr..to.Da te Cumularise i

i1. Ilours in Reporting Period 672 1416 87.703

12. Number Of Hour Reactor Was Critical 0

,_0 55,860.03

13. Reactus* Resene Shutdou n iour, 0

_0

__L4,200. 44

~

14. llours Generator On.Line O

n

_ sa _ qu.1g

15. Unit Resene Shutdown floun 0

0 0

16. Grow Thermal Energy Generated (MWH) 0 0

151: 24 5.1 A7 17 Grow Electrical Energy Generated (MhHi 0

0 50.771.708

18. Net Electrica! Energy Generated lMWH)

-2,609

_-5,704 49,297,269

19. Unit Senice Factor 0

0 62.0 0

0 62.0

20. Unit Asailability Factor
21. Unit Capacity Factor IUsing MDC Net) 0.

0

  • 52.8 0.

0

  • 52.8 2.'

Unit Caiueity FactorIUsing DER Net) 0 0

23.0

23. Unis Forced Outage Rate
24. Shutdowns Scheduled rner Next 6 MonthsIType.Date,and Duration of Eacht:
25. If Shus Down At End Of ileport Period. Estimated Date of Startup:

August 1. 1985

26. Units in Test Status tPrior to Commercial Operationn Forecast Achiesed 4

, INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8506070243 850419 PDR ADOCK 05000259 R

PDR

("/771 2

....