ML20129G298
Jump to navigation
Jump to search
| ML20129G298 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 01/31/1985 |
| From: | Thom T TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20129G244 | List: |
| References | |
| NUDOCS 8506070218 | |
| Download: ML20129G298 (1) | |
Text
y 31
- Corrected OPERATING DATA REPORT j
\\
DOCKET NO. _50-260 DATE 2/1/85 COMPLETED BY T. Thom TELEPHONE (205) 729-3834 OPERATING STATUS
- 1. Unit Name: Browns Ferry 2 Notes
- 2. Reporting Period:
January 1985
- 3. Licensed Thennal Powee (MWt):
3293
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe):
1098.4
- 7. Maximum Dependable Capacity (Net MWe):
1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,1f Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A f
This Month Yr..to Date Cumulative
- 11. Hours in Reporting Period 744 744 87.031
- 12. Number Of Hours Reactor Was Critical 0
0 55,860.03
- 13. Reactor Reserve Shutdown Hours 0
0 14T200.44
- 14. Hours Generator On-Line 0
0 54'.338.36
- 15. Unit ~ Reserve Shutdown floors 0
+
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
153.245.167__
17, Gross Electrical Energy Generated (MWH) 0 0
50.771.798
- 18. Net Electrical Energy Generated (MWH)
-3095
-3095 49.299.878
- 19. Unit Service Factor 0
0 62.4
- 20. Unit Availability Factor 0
0 62.4 0
0
- 53.2
- 21. Unit Capacity Factor (Using MDC Net) 0 0
- 53.2
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Eoacedeutage Rate 0
0 23.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Eacht:
L
(_
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Auenne 1. 1985 l
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved
' INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~~s
((h 9.
(9/77i
'~
__ ~