ML20129G298

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jan 1985
ML20129G298
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/31/1985
From: Thom T
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20129G244 List:
References
NUDOCS 8506070218
Download: ML20129G298 (1)


Text

y 31

  • Corrected OPERATING DATA REPORT j

\\

DOCKET NO. _50-260 DATE 2/1/85 COMPLETED BY T. Thom TELEPHONE (205) 729-3834 OPERATING STATUS

1. Unit Name: Browns Ferry 2 Notes
2. Reporting Period:

January 1985

3. Licensed Thennal Powee (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

1098.4

7. Maximum Dependable Capacity (Net MWe):

1065

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,1f Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A f

This Month Yr..to Date Cumulative

11. Hours in Reporting Period 744 744 87.031
12. Number Of Hours Reactor Was Critical 0

0 55,860.03

13. Reactor Reserve Shutdown Hours 0

0 14T200.44

14. Hours Generator On-Line 0

0 54'.338.36

15. Unit ~ Reserve Shutdown floors 0

+

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

153.245.167__

17, Gross Electrical Energy Generated (MWH) 0 0

50.771.798

18. Net Electrical Energy Generated (MWH)

-3095

-3095 49.299.878

19. Unit Service Factor 0

0 62.4

20. Unit Availability Factor 0

0 62.4 0

0

  • 53.2
21. Unit Capacity Factor (Using MDC Net) 0 0
  • 53.2
22. Unit Capacity Factor (Using DER Net)
23. Unit Eoacedeutage Rate 0

0 23.0

24. Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Eacht:

L

(_

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Auenne 1. 1985 l
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved

' INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

~~s

((h 9.

(9/77i

'~

__ ~