ML20129G131

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1985
ML20129G131
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1985
From: Hutchison L, Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8506070165
Download: ML20129G131 (4)


Text

o

(

OPERATING DATA REPORT DOCKET NO.

50-397 llNP-2 UNIT 4/3/85 DATE COMPLETED BY L.B. Hutchison (509) 377-2501 ext 2486 TELEPHONE OPER ATING STATUS

1. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD:

744 3

2. CURRENTLY AUTHORIZED POWER LEVEL g:

max. DEPEND. CAPACITY (MWe Net):

1095 DESIGN ELECTRICAL RATING (MWe Net,):

MAX. DEPEND. CAPACITY (MWe-GROSS:1 1I40

3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Neth NONE
4. REASONS FOR RESTRICTION (IF ANYl:

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL.............. 658.4 1796.2 2212.7 0

0 0

6. R EACTOR RESERVE SHUTCOWN HOURS...................

641*1 1688.9 2087.4

7. HOU RS GEN ER ATOR ON LIN E.....................

0 0

0

8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)

.... 2.078.640 5.330.140 6.543.768 686,230 1.770,300 2,197,230

10. GRCSS ELECTRICAL ENERGY GENERATED (MWH)..

659,898 1,701,157 2,111,543

11. NET ELECTRICAL ENERGY GENERATED (MWH) 88.5%

83.2%

85.1%

12. R EACTOR SE RVICE F ACTOR........................
13. R EACTOR AV AILA BILITY F ACTCR..................,....

86.2%

78.2%

80.3%

1,4. UNIT SERVICE FACTOR 86.2%

78.2%

80.3%

15. U NIT AV AILASILITY F ACTOR..........................

81.0%

71.9%

74.2%

1s. UNIT CAPACITY FACTOR (Using MDC) 80.6%

71.6%

73.8%

17. UNIT CAP ACITY FACTOR (Usmg Design MWel.............

13.8%

21.8%

19.7%

18. UNIT FCRCED CUTAGE RATE
19. SHUTDCWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND CURATICN CF EACHl:

Annual Maintenance Outage (M3) 5/1/85 for 60 days.

20. IF SHUT OCWN AT END OF REPORT PERIOD. ESTIMATED DATE CF STARTUP:
21. UNITS IN TEST STATUS (PRICR TO CCM*.tERCIAL CPERATlCNI:

FCRECAST ACHIEVED INI*1 AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL CPERATION Generator Name Plate 1,231,700 KVA 0 0.975 P.F.

h 8506070165 850331 g

PDR ADOCK 05000397 R

PDR

LNIT HAME WNP-2 DATE 4/2/85 LNIT SHUFDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD MARCH 19 85 TELEPHONE (509) 377-2501' ext 2486

month, year E M N NEX5DN N N. SYSTEM. 05FDMDif CAuSE & CuettCTIVE ACTION TO PREVENT RECURRENCE 85-07 3/22/85' F

.102.9 A

3 LATER HA INSTRU Reactor SCRAMMED at 100% power when placing the turbine DEH control system in the monitoring mode. ' Trouble shooting revealed:

i

1) A faulty computer memory board
2) A faulty EIS computer interface board i
3) A faulty Prom. logic card in the governor valve circuit.

Item 182 were replaced and item #3 was repaired.

The DEH control system was then tested and the unit returned to service.

(LER later) i s

l 1

I l SLM4ARY l TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 8-Maint or Test G-Oper Error 2-Manual-Scram Instructions for i

C-Refueling H-Other 3-Auto Scram Preparation or D-Re0ulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8

& License Examination 9-Other (LER) File (NUREG-0161)

O

(

i

0 AVERAGE DAILY UNTT POWER LEVEL 50-397 DOCKET NO.

UNTT WNP-2 DATE 4/2/85 COMPLETED BY L. 8. Hutchison TELEPHONE (509)377-2501 ext 2486

?! ARCH 1985 MONTri DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) 1072 1076 1

17 1012 1073 2

18 1079 1072 3

3, 1081 1069 4

20 1081 1072 s

21 1081 664 8

22 1084 0

7 23 1082 a

24 0

1025 0

g 2s 1082 8

to 2s 1077 678 11 27 1078 997 12,

2e 1078 13 29-874 1077 924 34 m

984 15 37 941 1074 16 INSTRUCHONS On this form, list the avera dail

      1. I'"I In MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Taese figure:, wi!!.be ::ed to plot a graph for ec:h reporting month. Note that when maximum dependable capscity is t: sed for the net electncal ratmg of thc-unit.taere may be oc::r.sions when the daily average power !cvel exceeds the IGG % line (or the restricted power !cvel line). In such esses, the average daily unit power output sheet should be footnoted to explain the apparent anorr.aly.

l 1

0 Washington Public Power Supply System 3000GeorgeWashingtonWay P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 April 8,1985 Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March.1985 as required by our Technical Specifications 6.9.1.6.

Very truly yours, hklkWtAh(M/D927M)

J. D. Martin WNP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth

- WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT I

'