ML20129F884

From kanterella
Jump to navigation Jump to search
Forwards SE Approving Request to Apply LBB Analyses to Eliminate Large Primary Loop Pipe Rupture from Structural Design Basis for Plant,Units 1 & 2
Date released: 05/22/2020 Download: ML20129F884


Safety Evaluation Accepting Request to Apply LBB Analyses to Eliminate Large Primary Loop Pipe Rupture from Structural Design Basis for Plant,Units 1 & 2
ML20129F910
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/25/1996
From:
NRC (Affiliation Not Assigned)
To:
References
Download: ML20129F910 (5)
Forwards SE Approving Request to Apply LBB Analyses to Eliminate Large Primary Loop Pipe Rupture from Structural Design Basis for Plant,Units 1 & 2
ML20129F877
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/25/1996
From: Assa R
NRC (Affiliation Not Assigned)
To:
COMMONWEALTH EDISON CO.
References
Download: ML20129F877 (4)