ML20129F597

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-440/96-07 on 960812-15.No Violations Noted
ML20129F597
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/25/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20129F602 List:
References
NUDOCS 9610020033
Download: ML20129F597 (3)


See also: IR 05000440/1996007

Text

_

.

.

September 25, 1996

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44nR1

SUBJECT:

II.dPECTION REPORT NO. 50-440/96007(DRS)

Dear Mr. Myers:

.This refers to the inspection conducted by Mr. M. Holmberg of this office on

'

August 12-15, 1996, of activities authorized for your Perry Nuclear Power

Plant, Unit 1, facility. The focus of this inspection was your inservice

inspection efforts. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed report.

4

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures,

representative records and interviews with personnel.

In a previous NRC inspection, management involvement and commitment to your

Erosion Corrosion (E/C) effort was considered weak.

The inspector reviewed

Flow-Accelerated Corrosion (formerly E/C) Program changes, which indicated

3

that current industry standards were being met and demonstrated increased

support for this program. The use of " state of the art" equipment to perform

ultrasonic examinations for the Inservice Inspection Program demonstrated an

important element of a quality program.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning these inspections.

Sincerely,

,

9610020033 960925

5'

Original signed by Brent Clayton for

PDR

ADOCK 05000440

G

PDR

Geoffrey E. Grant, Director

Division of Reactor Safety

1

Docket No. 50-440

Enclosure:

Inspection Report

No. 50-440/96007(DRS)

See Attached Distribution:

SEE PREVIOUS CONCURRENCES

DOCUMENT NAME:

G:\\DRS\\PER96007.DRS

To receive a copy of this document. Indicate in the box: "C" = Copy without attae%ent/ enclosure

  • E' = Copy with

attachment / enclosure

  • N* = No copy

0FFICE

RIII:DRS

RIII:DRP

l

RIII:DRS

l

RIII:DRS f c_

F

I

NAME

MHolmberg:nh

RLanksbury

JJacobson

HClayton/GGrant

[

^

'"

' ' #' ' '

010 O u'U

OFFICIAL RECORD COPY

TLL8LL 1b.-01

l

.

J

.

.

Septen1ber 25,1996

i

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT:

INSPECTION REPORT N0. 50-440/96007(DRS)

Dear Mr. Myers:

This refers to the inspection conducted by Mr. M. Holmberg of this office on

August 12-15, 1996, of activities authorized for your Perry Nuclear Power

Plant, Unit 1, facility. The focus of this inspection was your inservice

-inspection efforts. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

'these areas, the inspection consisted of selective examinations of procedures,

representative records and interviews with personnel.

In a previous NRC inspection, your Flow-Accelerated Corrosion (FAC) program

was considered weak. The inspector identified changes which bring your FAC

program up to the current industry standards and demonstrated increased

support for this program.

The use of " state of the art" equipment to perform

ultrasonic examinations for the Inservice Inspection Program demonstrated a

commitment to a quality program.

'

No violations of NRC requirements were identified during the course of this

inspection.

'

i

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC Public Document Room.

i

We will gladly discuss any questions you have concerning these inspections.

Sincerely,

Original signed by Brent Clayton for

'

!

Geoffrey E. Grant, Director

f

Division of Reactor Safety

Docket No. 50-440

l

Enclosure:

Inspection Report

No. 50-440/96007(DRS)

See Attached Distrib:stion:

.

,

DOCUMENT NAME:

G:\\DRS\\PER96007.DRS

i

To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure

'E" = Copy with

"

attachment / enclosure

  • N" = No copy

0FFICE

RIII:DRS

l6 Rill:DRA f E RIII:DRS.

E

RIII:DRS

NAME

MHolmberg:nh & RLankstkihMV JJacobsohn/HClayton/GGrant

'

DATE

09/ e/96

09/ W)G6[ (

09/ A /Q6 P

09/

/96

0FFICIAL RECORD COP W

--

. - -

..

. -

-

-

-

- -

.

.

L. W. Myers

-2-

cc w/ encl:

J. P. Stetz, Senior Vice

President - Nuclear

L. W. Worley, Director, Nuclear

Services Department

J. D. Kloosterman, Manager,

Regulatory Affairs

W. R. Kanda, Director, Perry

Nuclear Assurance Department

N. L. Bonner, Director, Perry

Nuclear Engineering Department

H. Ray Caldwell, General Superintendent

Nuclear Operations

R. D. Brandt, General Manager Operations

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

'

Distribution:

Docket File w/ encl

DRS w/ encl

A. B. Beach, RIII w/ encl

PUBLIC IE-01 w/ encl

RIII PRR w/ encl

Enf. Coordinator, RIII w/enci

OC/LfDCB w/ encl

SRI, Perry w/ encl

CAAl (E-mail) w/ encl

DRP w/ encl

LPM, NRR w/ encl

W. L. Axelson, RIII w/ encl

.