ML20129E143

From kanterella
Jump to navigation Jump to search
Amends 63 & 34 to Licenses DPR-70 & DPR-75,respectively, Providing Four Addl Mods to Radiological Effluent Tech Specs Issued in Amends 59 & 28 to Licenses DPR-70 & DPR-75, Respectively
ML20129E143
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/28/1985
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20129E147 List:
References
NUDOCS 8506060364
Download: ML20129E143 (14)


Text

e 4

/

g UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 5

j WASHINGTON, D. C. 20S55 kg....,/

PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELEClHIC COMPANY DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 63 License No. DPR-70 1.

The Nuclear Remilatory Comission (the Comission) has found that:

A.

The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated February 8,1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of-the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of *.he Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:

8506060364 850528 PDR ADOCK 05000272 P

PDR

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 63, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUC REGULAT(AY COMMISSION VaIga h f Operating React rs Branch #1 Division of Lice g

Attachment:

' Changes to the Technical Specifications Date of Issuance: May 28, 1985

t ATTACHMENT TO LICENSE AMENDMENT NO.63 FACILITY OPERATING LICENSE N0. DPR-70 DOCKET NO. 50-272 Revise Appendix A as follows:

Remove Pages Insert Pages 3/4 3 3/4 3-60 3/4 11-16 3/4 11-16 3/4 11-16

TABLE 3.3-12 (Continuad)

TABLE NOTATION ACTION 26 - With tha number of channals OPERABLE less than required by the Minirum Channels OPERABLE requirenent, effluent releases may continue provided that prior to initiating a release:

a.

At least two independent samples are analyzed in accordanca with Specification 4.11.1.1.1, and b.

At least two technically qualified mmmbers of the Facility Staff iadependently verify the release rate calculations and discharge line valving; Otherwise, suspend release of radioactive effluents via this pathway.

ACTION 27 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided grab samples are analyzed for gross rad}oactivity (beta or gamma) at a limit of detection of at least 10- microcuriec/ gram:

a.

At least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when the specific activity of the secondary coolant is greater than 0.01 microcuries/ gram DOSE EQUIVALENT I-131.

b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the specific activity of the secondary coolant is less than or equal to 0.01 microcuries/

gram DOSE E0VIVALENT I-131.

ACTION 28 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided that:

a.

With a Service Water System leak on the Containment Fan Coil Unit associated with the inoperable nonitor either:

1.

Grab samples are to be collected and analyzed for gross activity { beta or gamma) at a limit of detection of at least 10- uCi/ gram at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or 2.

Isolate the release pathway, b.

With no identified service water leakage on the Containment Fan Coil Ur.it associated with the inoperable conitor, collect grab samples and analyze for gross radioactivity (beta or gamna) at a limit of detection of at least 10-7 uC1/ gram at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SALEM - UNIT 1 3/4 3-60 Amendment No. 63 i

h RADIOACTIVE EFFLUENTS GAS STORAGE TANKS LIMITING CONDITION 40R OPERATION 1

storage tank shall 3.11.2.6 The quantity of radioactivity contained in each g 3).

be limited.to 36,000 curies noble, gases (considered as Xe-APPLICABILITY: At all times.

n

  • ACTION:

i ter il in any gas storage tank With the quantity of radioactiv spend all additions of a.

exceeding the above limi<

immedia e

w thin 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> reduce the tank raJioactive material to taAk a contents to within the 1-

t. ' T b.

The ;;*ovisions of. Specifi uti' s 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS i:

J o ::tive material contained in each gas storage 4.11.2.6 The quantity of ithin the above limit at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> tank shall be determined hhen radioactive material e being added to the tank.

l l~

~

f Amendment No. 63

-SALEM - UNIT 1 3/4 11-16

I THIS PNE INIHEICNALLY BIRE SALE - WIT 1 3/4 11-16 Amendment No. 63

i

[

og UNITED STATES g

g NUCLEAR REGULATORY COMMISSION 1

j WASHINGTON, D. C. 20555 5

...../

PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELEGIRIC COMPANY DOCKET N0. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 34 License No. DPR-75 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated February 8,1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendr.

is in accordance with 10 CFR Part 51 of the Comission's regulo. ons and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license

- amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:

' (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 34, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR LATORY COMMISSION h

1

[evenA. a da Ci Operating Reactors B nch #1 Division of Licensi

Attachment:

Changes to the Technical Specifications

'Date of Issuance: May 28, 1985

4 ATTACHMENT TO LICENSE AMENDMENT NO. 34 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311

- Revise Appendix A.as follows:

Remove Pages Insert Pages 3/4 3-54 3/4 3-54 3/4 3-55 3/4 3-55 3/4 3-56 3/4 3-56 i.

3/4 11-16 3/4 11-16 3/4 11-16 I

l-i i

i-l l

1

.1-_

TABLE 3.3-12 RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION w

MINIMUM CHANNELS INSTRUMENT OPERABLE ACTION 1.

GROSS RADI0 ACTIVITY MONITORS PROVIDING AUTOMATIC TERMINATION OF RELEASE a.

Liquid Radwaste Ef fluent Line (2-R13) 1 26 b.

Steam Generator Blowdown Line 4

27 (2-R19 A, 3, C, and D) 2.

GROSS RADI0 ACTIVITY MONITORS NOT PROVIDING AUTOMATIC w1 TERMINATION OF RELEASE

a. - Containment Fan Coolers - Service Water Line 3

28

^

(2-R13 A, B, C) Discharge b.

Chemical Waste Basin Line (R37) 1 31 3.

FLOW RATE MEASUREMENT DEVICES a.

Liquid Radwaste Effluent Line 1

29 5

b.

Steam Generator Blowdown Line 4

29 5

3 4

TANK LEVEL. INDICATING DEVICES a.

Temporary Outside Storage Tanks as Required 1

30

TABLE 3.3-12 (Continued)

TABLE NOTATION ACTION 26 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases may continue provided that prior to initiating a release:

a.

At least two independent samples are analyzed in accordance with Specification 4.11.1.1.1, and b.

At least two technically qualified members of the Facility Staff independently verify the release rate calculations and discharge line valving; Otherwise, suspend release of radioactive effluents via this pathway.

ACTION 27 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided grab samples are analyzed for gross radioactivity (beta or gamma) at a limit of detection of at least 10-/ microcuries/ gram:

a.

At least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when the specific activity of the secondary coolant is greater than 0.01 microcuries/ gram DOSE EQUIVALENT I-131.

b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the specific activity of the secondary coolant is less than or equal to 0.01 microcuries/

gram DOSE EQUIVALENT I-131.

ACTION 28 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway pay continue provided that:

a.

At least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, local monitor readouts for the affected channels are verified to be below their alarm setpoints, or l

l b.

With a Service Water System leak on the Containnent Fan Coil Unit associated with the inoperable monitor either:

1.

Grab samples are to be collected and analyzed for gross radioactivity (beta or gramma) at a limit of detection of L

at least 10-/ uCi/ gram at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or 2.

Isolate the release pathway.

u c.

With no identified service water leakage on the Containment Fan l

Coil Unit associated with the inoperable monitor collect grab a limit of detection of at lea:t 10 qtivity (beta or gamma) at samples and analyze for gross radioa i uCi/ gram at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SALEM - UNIT 2 3/4 3-55 Amendment No. 34

~

TABLE 3.3-12 (Continued)

TABLE NOTATION ACTION 29 - With the number of channels OPERABLE less than required by the Mininum Channels OPERABLE requirement, effluent releases via this pathway may continue provided the flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during actual releases.

Pump performance curves may be used to estimate flow.

ACTION 30 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, liquid additions to this tank rey continue for up to 30 days provided the tank liquid level is estimated during all liquid additions to the tank.

ACTION 31 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided that sampling is conducted in accordance with the following table:

Frequency Conditio n 1/ week During nornal operation (all MODES) 1/ day During operation with an identified primary to secondary leak on either Salem Unit.

4 SALEM - UNIT 2 3/4 3-56 Amendment No. 34

t-RADI0 ACTIVE EFFLUENTS GA5 STORAGE TANKS LIMITING CONDITION FOR OPERATION 3.11.2.6 The quantity of radioactivity c tained i each gas storage tank shall be limited to 36,000 curies noble gases const as Xe-133).

APPLICA81LITY: At all times.

n ACTI0ft:

I Withthequantityobatoact material in any gas storage tank a.

exceedirig the above 1 Imi diately suspend all additions of radioactive material ';o ank and within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> reduce the tank contents to within t t 1 b.

The provisto of 3 f ations 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREME V

~]

.n 1

/Q 4.11.2.6 The quanti of radioactive material contained in each gas storage tank shall be date n

to be within the above limit at least.once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I

when radioa'ctive teri s are being added to the tank.

t l

~

I l

e*

SALEM - UNIT 2 3/4 11-16,

Amendment No. 34 8

I' 1

\\

DIIS PA2 INTENTICNALLY MAq Amendment No. 34

-M2 3/4 11-16