ML20129D966

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-266/96-09 & 50-301/96-09 on 960826- 0925 & Notice of Violation
ML20129D966
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/18/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20129D972 List:
References
NUDOCS 9610250225
Download: ML20129D966 (2)


See also: IR 05000266/1996009

Text

..

1

October 18, 1996

Mr. Robert Link

Vice President, Nuclear Power

Wisconsin Electric Power Company

231 West Michigan Street - P379

Milwaukee, WI 53201

SUBJECT:

NRC RADIATION PROTECTION INSPECTION REPORTS N0. 50-266/96009(DRS);

50-301/96009(DRS) AND NOTICE OF VIOLATION

Dear Mr. Link:

On September 25, 1996, the NRC completed an inspection at your Point Beach

'

Nuclear Plant. The results of this inspection were discussed on September 25,

1996, with Mr. E. Lange of your staff. The enclosed report presents the

results of that inspection.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with personnel.

Based on the results of this inspection, certain of your activities appeared

,

'

to be in violation of NRC requirements, as specified in the enclosed Notice

of Violation (Notice). The violation is of concern because radiation

protection personnel did not adequately verify that no unauthorized personnel

were present within an area that they posted as a high radiation area in

anticipation of a spent resin transfer. Although corrective actions for

previous high radiation area control problems would not have been expected to

prevent this occurrence, it is of particular concern that high radiation area

control problems continue at your facility.

In addition to the specific

corrective actions you plan to take for this violation, please include in your

response to this letter the actions you plan to take to improve high radiation

area controls in general at your facility.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter, its enclosures and your response to this letter will be placed in

the NRC Public Document Room (PDR). To the extent possible, your response

should not include any personal privacy, proprietary, or safeguards

'

,

information so that it can be placed in the PDR without reduction.

f

iQ$

9610250225 961018

PDR

ADOCK 05000266

G

PDR

,

_

..

.

"

R. Link

-2-

October 18, 1996

The response directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Public Law No. 96.511.

We will gladly discuss any questions you have concerning this inspection.

Your cooperation with us is appreciated.

Sincerely,

Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Directc,

,

Division of Reactor Safety

Docket Nos. 50-266; 50-301

Licenses No. DPR-24; DPR-27

Enclosures:

1.

Notice of Violation

2.

Inspection Reports No.

50-266/96009(DRS);

50-301/96009(DRS)

cc w/encls: S. A. Patulski, Site General Manager

A. J. Cayia, Plant Manager

Virgil Kanable, Chief, Boiler Section

Cheryl L. Parrino, Chairman,

Wisconsin Public Service Commission

State Liaison Officer

Distribution:

Docket File w/encls

DRS w/encls

A. B. Beach, RIII w/encls

i

PUBLIC 496> w/encls

RIII PRR w/encls

Enf. Coordinator, RIII w/encls

OC/t.FDCB w/encls

SRI, Pt. Beach w/encls

CAAl w/encls (E-mail)

y

DRP w/encls

LPM, NRR w/encls

W. L. Axelson, RIII w/encls

DOCUMENT NAME:

G:DRS\\P0196009.DRS

To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

0FFICE

RIII

l

RIII

l

RIII

l Al RIII_

l Al

RIII /,C 6

,_,

NAME

jp

TKoza

BJ

sen

1

on/

DATE

10// 7//96

10// 7 /96

10/ 17 /96

10/l? /96

10/ /g /96

0FFICIAL RECORD COPY