ML20129D931
| ML20129D931 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/12/1985 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jens W DETROIT EDISON CO. |
| Shared Package | |
| ML20129D936 | List: |
| References | |
| NUDOCS 8507160694 | |
| Download: ML20129D931 (2) | |
See also: IR 05000341/1985030
Text
, _.
k8
,
.
- erwtM!
j
h ,,,c,,M ; m L).d
i W U R I M N k V R
r
JUL 1215
Docket No. 50-341
The Detroit Edison Company
ATTN:
Wayne H. Jens
Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to the routine safeguards inspection conducted by Messrs.
T. J. Madeda and J. L. Belanger of this office on June 10-14, 1985, of
activities at the Enrico Fermi Atomic Power Plant, Unit 2, authorized by
NRC Operating License No. NPF-33, and to the discussion of our findings
with Mr. E. P. Griffing, and other members of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
Areas examined during this inspection concern a subject matter which is
exempt from. disclosure according to Section 73.21(c)(2) of the NRC's
" Rules of Practice," Part 73, Title 10, Code of Federal Regulations.
This
information must be handled and protected in accordance with the provisions
of 10 CFR 73.21.
Consequently, the enclosure to this letter, our report of
this inspection, and your response to the noncompliance identified in the
enclosure to this letter will not be placed in the Public Document Room.
~Therefore, your statement of corrective action regarding the noncompliance
identified in the enclosure should be submitted as a separate enclosure to
your transmittal letter in the manner prescribed.
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Enclosure contains
~ % p/
8507160694 850712
SAFEGUARDS INFORMATIONd
1
ADOCK 0500
$DR
Uoon' separation this
pege is Decontrolled
i\\
c m y -
,,
n w .,. ,m
%nua.Q%H\\tdddlN DA W l BOO
3
(
z
,_
.
P * "* n t 5 ,5, O n e V M t An tt 5 R"'v: 7. '
' u, uwv mia vuuvu u av Di
Gu
r
The Detroit Edison Company
2
M 12 M
We will gladly discuss any question:, you have concerning this inspection.
Sincerely,
.
W. L. Axe s n, Chief
Nuclear Materials Safety
and Safeguards Branch
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-341/85030(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosures:
L. P. Bregni, Licensing
Engineer
P. A. Marquardt, Corporate
Legal Department
IE Files
IE/DQASIP/0RPB
IE/ES
NMSS/SGPL
NRR/DL/SSPB
Resident Inspector, RIII
cc w/ enclosures w/o UNCLASSIFIED
SAFEGUARDS INFORMATION:
DMB/Documer- ontrol Desk (RIDS)
Ronald Calleri, .4ichigan
Public Service Commission
Harry H. Voigt, Esq.
Nuclear Facilities and
Environmental Monitoring
Section
Enclosure contains
SAFEGUARDS INFORMATIS
Upon separation this
page is Decontrolled
RIII
RIII
RIII
RJ I
RIII
R II
nger
eed
/
tri
otimos
Weil
so
a/jp
i
1/10/85
{
c:n.,, , _ . , _ ,l l1)gT
L =< ~v:ain W d ilYI W igifi