Text

\\

M SEABROOK STATION Engineering Office Pdst: 5en4ce ot Phnw Pkynpahbe New Hampshire Yankee Divh July 12, 1985 SBN-842 T.F. B7.1.2 i

United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing

References:

(a)

Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b)

PSNH Letter, dated May 18, 1984, "Seabrook Station Probabilistic Risk Assessment," J. DeVincentis to G. W. Knighton (c)

PSNH Letter, dated October 17, 1984, "Seabrook Station Probabilistic Safety Assessment (SSPSA)," J. DeVincentis to G. W. Knighton (d) USNRC Letter, dated April 4,1985, "Seabrook PRA Review,"

G. W. Knighton to R. J. Harrison (e) PSNH Letter, dated May 29, 1985, "Seabrook Station Technical Specification Improvement Program,"

J. DeVincentis to G. W. Knighton

Subject:

Seabrook Station Probablistic Safety Assessment (SSPSA)

Dear Sir:

In our letters [ References (b) and (c)), we indicated to you our position regarding further support of the "Seabrook Station Probabilistic Safety Assessment (SSPSA)." Due to financial constraints put on the Project over the last year, we had reluctantly terminated our contract with our consultant and were only able to provide minimal support to the NRC in its review of the SSPSA.

Subsequently you responded via Reference (d) in which you and the staff determined that the review of our SSPSA would be terminated and a draf t review report was provided therein.

We agree with the conclusion of your review which did not identify any safety issues which merit immediate action or errors which could significantly change the quantitative results of our SSPSA.

Additionally, we have reviewed in detail those concerns which were identified in the Lawrence Livermore Laboratories (LLNL) draft review report and believe those concerns could easily be addressed with closer interaction among the technical staffs involved. Such interaction would lead to a final review report which would show a greater appreciation of our SSPSA.

8507160634 050712" "~

Seobrook. NH 03874. Totophone (603) 474-%21

"^

ADOCKOS000g}3 0

PDR A

t.

United States Nuclear Regulatory Commission Attention:

Mr. George W. Knighton Page 2 Though it is understood that a Probabilistic Safety Analysis (PSA) is not a licensing requirement, we recognize the significance and usefulness of a completed PSA. We intend to support the completion of the NRC SSPSA review.

We feel that supporting the completion of the review will supply both us and the NRC with a set of technical tools that will aid in evaluating activities and modifications which provide plant enhancements aimed at improving safety.

i As noted in Reference (e), we are presently evaluating various i

improvements in the Technical Specifications area which will be contingent upon risk analysis and engineering judgment. A successful attempt to improve 3

Technical Specifications using risk analysis would be aided by an effective l

PSA review. Therefore, we have initiated those efforts needed to support the continuation of the SSPSA review.

Based on our preliminary review of the LLNL report and our efforts to l

make improvements to Technical Specifications, we have recently contracted with our PSA consultants to continue the support of the SSPSA. We would like to meet specifically with your staff to discuss completion of the SSPSA review. Our goal is to support the schedules of activities which could realize the benefits of a completed PSA. We believe that with such a meeting, we can begin the resolution of the LLNL draf t review report concerns and l

establish the schedules and action items necessary for supporting the completion of the SSPSA review.

It would be most appreciated if you would inform us as to when we could meet. We would be most amenable to meet with you in July or early August.

Should you have any questions regarding this issue, please do not hesitate to contact us.

Very truly yours, lha /b M^ bb[

V John DeVincentis, Director Engineering and Licensing ec: ASLB Service List i

i l

l i

o s:

William S. Jordan, III Donald E. Chick Diane Curran Town Manager Harmon, Weiss & Jordan

'fown of Exeter 20001 S. Street, N.W.

10 Front Street t

Suite 430 Exeter, NH 03833 Washington, D.C.

20009 Brentwood Board of Selectmen Robert G. Perlis RED Dalton Road Office-of the Executive Legal Director Brentwood, NH 03833 U.S. Nuclear Regulatory Commission Washington, DC 20555 Richard E. Sullivan, Mayor City Hall Robert A. Backus, Esquire Newburyport, MA 01950 116 Lowell Street P.O. Box 516 Calvin A. Canney Manchester, NH 03105 City Manager City Hall Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Augusta, ME 04333 Dana Bisbee, Esquire Mr. John B. Tanzer Assistant Attorney General Designated Representative of Office of the Attorney General the Town of Hampton 208 State House Annex 5 Morningside Drive Concord, NH 03301 Hampton, NH 03842 Anne Verge, Chairperson Roberta C. Pevear Board of Selectmen Designated Representative of Town Hall the Town of Hampton Falls South Hampton, NH 03827 Drinkwater Road Hampton Falls, NH 03844 Patrick J. McKeon Selectmen's Office Mrs. Sandra Gavutis 10 Central Road Designated Representative of Rye, NH 03870 the Town of Kensington RFD 1 Carole F. Kagan, Esquire East Kingston, NH 03827 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Jo Ann Shotwell, Esquire Washington, DC 20555 Assistant Attorney General Environmental Protection Bureau Mr. Angi Machiros Department of the Attorney General Chairman of the Board of Selectmen One Ashburton Place, 19th Floor Town of Newbury Boston, MA 02108 Newbury, MA 01950 Senator Cordon J. Humphrey Town Manager's Office U.S. Senate Town Hall - Friend Street Washington, DC 20510 Amesbury, MA 01913 (ATTN Tom Burack)

Senator Cordon J. Humphrey Diana P. Randall 1 Pillsbury Street 70 Collins Street Concord, NH 03301 Seabrook, NH 03874 (ATTN Herb Boynton)