AIAY 2 91985 Docket Nos.: 50-440 and 50-441 Mr. Murray R. Edelman, Vice President Nuclear Operations Group The Cleveland Electric Illuminating Company
Dear Mr. Edelman:
Subject:
NRC Staff Coments on FSAR Amendment 18 for the Perry Nuclear P,wer Plant (Units 1 and 2).
The items listed be'.3w identify discrepancies found by the NRC Staff from its review of changes made to Chapter 7 of the FSAR documented in FSAR Amendment
- 18. Please note that the staff and its consultant (EG8G Idaho) are still in the process of reviewing the portion of FSAR Amendment 18 that relates to Regulatory Guide 1.97, Revision 2.
Should there be any coments, they will be submitted separately.
As indicated, above the following discrepancies have been found from the staff's review of Chapter 7 of FSAR Amendment 18:
(1) Figure 7.3-3, " Nuclear Boiler System Functional Control Diagram".
The logic depicted by this functional control diagram is incorrect in that the manual inhibit logic has been omitted and the high drywell pressure actuation is erroneously being shown as part of both actuation logics (Channels A and B).
8506060188 850529 PDR ADOCK 05000440 A
]
\\
s
' Q' s Mr. Murray R. Edelman (2) Figure 7.3-4, "LPCS System Functional Control Diagram".
The logic for the low pressure permissive is incorrect in that it is depicted as part of the local injection valve control switch logic and not part of the automatic system actuation logic.
(3) Figure 7.3-5, "RHR System Functional Control Diagram".
Same as coment (2) above. Also, the diagram title for sheets 1 through 5 is incorrect in that "RWR" should be "RHR".
Your expeditious attention in resolving the above discrepancies is requested.
Should your staff desire to discuss this letter with the staff, please advise the Perry Project Manager accordingly.
Sincerely.
-Gn B. J. Youngblood, Chief Licensing Branch No. I Division of Licensing
PERRY MAY 2 91985 j
Mr. Murray R. Edelman, Vice President Nuclear Operations Group The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 cc:
Jay Silberg, Esq.
Mr. Larry 0. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1800 M Street, N. W.
Illuminating Company 1
Washington, D. C.
20006 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser, Esq.
The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office
~ U. S. Nuclear Regulatory Commission Parmly at Center Road Perry, Ohio 44081 Regional Administrator U. S. NRC, Region III 799 Roosevelt Road Glen Ellyn, I1?inois 60137 Donald T. Ezzone, Esq.
Assistant Prosecuting Attorney 105 Main Street Lake County Adminia tration Center Painesville, Ohio 44077 Ms. Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, Ohio 44060 Terry J. Lodge, Esq.
618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.
Prosecuting Attoitey Ashtabula County Courthouse Jefferson, Ohio 44047
AIAY 2 01985 o
J.
Mr. Murray R. Edelman (2) Figure 7.3-4, "LPCS System Functional Control Diagram".
The logic for the low pressure pennissive is incorrect in that it is depicted as part of the local injection valve control switch logic and not part of the automatic system actuation logic.
(3) Figure 7.3-5, "RHR System Functional Control Diagram".
Sameascomment(2)above. Also, the diagram title for sheets 1 through 5 is incorrect in that "RWR" should be "RHR".
Your expeditious attention in resolving the above discrepancies is requested.
Should your staff desire to discuss this letter with the staff, please advise the Perry Project Manager accordingly.
Sincerely, B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing DISTRIB JTION:
ageenet s les;;3 NRC PDR Local PDR PRC System NSIC LBf1 R/F MRushbrook JStefano OELD ACRS (16)
JPartlow BGrimes EJordan TMNovak,A/DL RW4urston,AD/RS FRosa, ICSB JMauch, ICSB LB J/DL-LB#1/DL[
6N Cj!05 dStefano/mac BJYoungblood
/85 05/Sa/85