ML20129D394

From kanterella
Jump to navigation Jump to search
Amend 76 to License DPR-72,changing Tech Spec Table 3.6-1 to Allow Replacement of Six Manual Valves W/Eight Remote Manual Valves to Provide Capability to Install Hydrogen Recombiner
ML20129D394
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/03/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Florida Power Corp, City of Alachua, FL, City of Bushnell, FL, City of Gainesville, FL, City of Kissimmee, FL, City of Leesburg, FL, City of New Smyrna Beach, FL, Utilities Commission, City of New Smyrna Beach, FL, City of Ocala, FL, City of Orlando, FL, Orlando Utilities Commission, Sebring Utilities Commission, Seminole Electric Cooperative, City of Tallahassee, FL
Shared Package
ML20129D400 List:
References
DPR-72-A-076 NUDOCS 8507300013
Download: ML20129D394 (5)


Text

F 8 '$

UNITED STATES

}*

/

NUCLEAR REGULATORY COMMISSION e

i l

wassinctow, p. c. rosss

  • %..../

FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BU5HNELL CITY OF GAINE5VILLE CITY OF KI55IPMEE CITY OF LEE 5 BURG CITY OF NEW SMYRNA BEACH AND UTTETTITT'MRTISION, CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLAND0 UTILITIES NRfiffMI'7RD CITY OF ORLANDO SEBRING UTILITIES CDPRI55 ION SEMINOLE ELEL,1NIC COOPERATIVE, INC.

CITY OF TALLAHAS5EE DOCKET NO. 50-302 CRYSTAL. RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.'76 License No. OPR-72 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Florida Power Corporation, et al.

(the licensees) dated February 27, 1985, as supplemented June 25, 1985, complies with the standards and re Energy Act of 1954, as amended (the Act)quirements of the Atomic

, and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 l

of the Comission's regulations and all applicable requirements have L

been satisfied.

8507300013 850703 DR ADOCK 0500 2

l t

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.776, are hereby incorporated in the license. Florida Power Corporation shall operate the facility in accordance with the-Technical Specifications.

3.

This lir inse amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMilSSION J n 'F. Stolz, Chief

,J per ting Reactors Branch #4 l

sion of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:JJuly 3,1985

)

4 i

-t j'

a

' Ay MHMENT TO LICENSE AMENDMENT NO.76 FACILITY OPERATING LICENSE NO. OPR-72 DOCKET /Nf 50-302 Replace the following page of the Appendix "A' Technical Specifications with' th't enclosed page..The revised'page is identified by Amendment number and contains vertical ilnes indicating the area of change. The correspondirg overleef page is also provided to maintain document completeness.

J v

.~

3/4 6-21 T

/

s s

P 1

i e

T l

s

!~

6 1

\\

r 3,

TABLE 3.6-1 (continued)

'1 g.

).

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME s

(seconds)

LRV-43 Iso. LR test panel from RB NA LRV-44 NA LRV 46 NA LRV-87 & 88*

lso. H2 recombiner ports from RB NA LRV-89 & 90*

NA LRV-91 & 92*

NA LRV.93 & 94*

NA 3.

MSV-146 #

iso. misc. waste storage NA tank from RCSG-1B I

MSV-128 il NA 4.

NGV.62 iso. NG system from steam NA generators NGV-81 #

NA NGV-82 Iso. NG system from pzr.

NA J.

SAV-24

!se. SA from RB NA SAV-23 & 122 NA 6.

SFV-18 iso 5F system NA SFV-19 NA SFY-119 #

Iso. Fuel Transfer tubes from NA F.T. Canal SPV-120 #

NA 7

WSV-1 iso, containment monitoring NA system from RB WSV-2 NA D. PENETRATIONS REQUIRING TYPE B TESTS Blind Flange 119 Iso. RB NA Blind Flange 120 NA B11nd Flange 202 NA CRYSTAL RIVER - UNIT 3 3/46-21 Amendments Nos. if, 7$, )$,76

TABLE 3.6-1 (Continued)

CONTAINME'NT ISOLATION VALVES VALVE tWMBER

  • FUNCTION ISOLATION TIME (seconas)

Blind Flange 348 iso. fuel transfer tube from NA' Transfer' Canal B1'ind Flange 436 N6 Equipment Hatch iso. RB NA Personnel Hatch iso. RB NA f Not subject to Type C Leakage Test

  • The provisions of Specification 3.0.4 are not applicable.

s (A)

Isolates on Diverse Isolation Actuation Signal A (B)

Isolates on Diverse Isolation Actuation Signal B (A/B)' Isola ~tes on Diverse Isolation Actuation Signal A or B CRYSTAL RIVER;- UNIT 3 3/4 6-21a Amendment No. M I

..