Advises That Current Health Physics Network (HPN) Telephone Sys Will Be Replaced W/Dedicated Commercial Circuits.Access to Extensions Currently Installed Requested.Priority Order in Which Commercial HPN Svc Will Be Installed Provided
ML20129D328
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/11/1985
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8507160494
Download: ML20129D328 (2)


Text

_

w .~

(

i

! JUL 1 1 1985 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

For the past several years, NRC Headquarters has been working to provide a Health Physics Network (HPN) that will operate reliably. We are now convinced that the current system cannot be made to operate to our satisfaction.

Therefore, a decision has been made to replace the current HPN telephone system with dedicated commercial circuits. In order to increase the probability of being available in an emergency, each of the replacement HPN commercial circuits will be routed through an exchange at a telephone company Central Office different from the office that the facility's circuits are routed through.

Existing HPN service is currently installed, or ordered to be installed, in the EOF, TSC, Health Physics Office and NRC Resident Inspector's Office. The new system will be located only in the EOF and TSC, and will be removed from the Health Physics Office and the Resident Inspector's Office where currently installed. In order to make these changes, telephone company personnel will need access to all HPN extensions currently installed and any locations in the EOF and TSC where an HPN extension was to be located but is not yet installed.

The following is the priority order in which we will have commercial HPN service installed.

1. Install commercial service at those facilities where no HPN service exists.
2. Install connercial service at those facilities where no HPN service exists in the EOF but does in the TSC.
3. Install commercial service at those facilities where no HPN service exists in the TSC but does in the EOF.
4. Replace existing HPN special circuitry with commercial service at those facilities that currently have HPN special circuitry. Replacement service will be in the E0F and TSC, only. All other locations are to be removed.

8507160494 050711 ,, /

DR ADOCK0500g0 g },)

1

r k- 4 The Cleveland Electric Illuminating 2 3g Company More definitive, plant-by plant schedules will be forthcoming when the dates for changes in service are known.

Should you have any questions or need further information Ms. Linda Kers, Emergency Response Coordinator, is the Regional point of contact for assuring coordination between your facilities and the telephone companies. She may be reached on (312) 790-5711.

Sincerely, J A.

f<ind, Director ivision of Radiation Safety and Safegi:ards cc: J. J. Waldron, Manager, Perry Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management Section DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.

James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health RIII RI I RIIIitt RIII v ' /) ~.

.{IKV -

P 1/, lip' s RII')i

' f e'lo Norelip*s 9 85 q y J'r 1/ 9J//W

-