Informs of Confirmatory Audit on Implementation of License Amend 97 for Plant on 961114.W/agenda
ML20129C910
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/22/1996
From: Kim T
NRC (Affiliation Not Assigned)
To: Richard Anderson
NORTHERN STATES POWER CO.
References
TAC-M94309, NUDOCS 9610240145
Download: ML20129C910 (4)


Text

- - -- - . - - - . - -. .. . . . - . - - . . - - ~

Mr. Roger 0. Anderson, Dir2ctor

,. Licensing and Management Issues i

Ntrthern States Power Company 414 Nicollet Mall Minneapolis, MN 55401

i

SUBJECT:

CONFIRMATORY AUDIT ON IMPLEMENTATION OF LICENSE AMENDMENT NO. 97 -

MONTICELLO NUCLEAR GENERATING PLANT (TAC NO. M94309) i i

Dear Mr. Anderson:

} As we have previously indicated to you in a letter dated September 17, 1996, the NRC will perform a confirmatory audit on the implementation of Amendment No. 97 to Facility Operating License No. DPR-22 for the Monticello Nuclear Generating Plant. The onsite audit activities are scheduled for November 14, '

1996. The agenda for the audit is enclosed for your information. The contents of this agenda was communicated to Mr. Marvin Engen of your staff on l

October 8, 1996.

1 Amendment No. 97, as approved by the NRC on September 17, 1996, modifies the 4

requirements for avoidance and protection from thermal hydraulic instabilities to be consistent with the Boiling Water Reactor (BWR) Owners Group long-term solution Option I-D described in the Licensing Topical Report NED0-31960, "BWR Owners Group Long-Term Stability Solutions Licensing Methodology," June 1991,

and NED0-31960, Supplement 1, dated March 1992. NEDO-31960 and Supplement 1 l to NED0-31960 were endorsed by the NRC staff in a letter to L.A. England (BWR

! Owners Group) dated July 12, 1993. The amendment also adds the fuel cycle

dependent stability power and flow limits in the Core Operating Limits Report.

l- The main purpose of the audit is to confirm that the station procedures, j guidelines, and training are adequate for Option I-D implementation. The j audit will be conducted by Dr. Tai Huang of this office and a NRC contractor. 3

! The results of the audit will be documented in an audit report which should be '

issued within 45_ days of the audit.

If you have any questions regarding the enclosed agenda, or on the audit itself, please call. me at (301) 415-1392.

Sincerely,

/s/

Tae Kim, Senior Project Manager Project Directorate 111-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

Audit Agenda cc w/ encl: See next page DOCUMENT NAME: G:\WPDOCS\MONTICEL\ MON 94309.AUD *See previous concurrence

v. . .e m. w me m m. we c - cm nwui m.* nu.a.w . r - c , .wi m.m nu.n.w.

v - u. ,y ,

I OFFICE PM:PD31 16 LA:PD31 & *SC:SRXB l D:PD31 gl l , e NAME TJKim 7:@K CJamersonob LPhillips JHannon" I DATE m / g /96 to / 24 /96/ 10/17/96 ;O / >7/96 -

0FFI()ALRECORDCOPY 24coM 9610240145 961022 PDR ADOCK 05000263 EC FILE CENTER COPY P PDR

i d

Mr. Roger 0. Anderson, Director Monticello Nuclear Generating Plant Northern States Power Company CC:  ;

J. E. Silberg, Esquire Adonis A. Nebiett Shaw, Pittman, Potts and Trowbridge Assistant Attorney General 2300 N Street, N. W. Office of the Attorney General Washington DC -20037 445 Minnesota Street Suite 900 U.S. Nuclear Regulatory Commission St. Paul, Minnesota 55101-2127 Resident Inspector's Office 2807 W. County Road 75 Monticello, Minnesota 55362 Plant Manager Monticello Nuclear Generating Plant 3

ATTN: Site Licensing Northern States Power Company 2807 West County Road 75 Monticello, Minnesota 55362-9637 Robert Nelson, President Minnesota Environmental Control Citizens Association (MECCA) 1051 South McKnight Road St. Paul, Minnesota 55119 Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, Minnesota 55119 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Commissioner of Health Minnesota Department of Health 717 Delaware Street, S. E.

Minneapolis, Minnesota 55440 Darla Groshens, Auditor / Treasurer Wright County Government Center 10 NW Second Street Buffalo, Minnesota 55313 Kris Sanda, Commissioner Department of Public Service

121 Seventh Place East Suite 200 St. Paul, Minnesota 55101-2145 w,y ms

DISTRIBUTION FOR LETTER TO R.A. ANDERSON DATED: October 22, 1996 Docket File PUBLIC P031-1 Reading l J. Roe /E. Adensam l C. Jamerson l T. Kim OGC G. Holahan

- T. Collins L. Phillips T. Huang

ACRS

, B. Jorgensen, RIII i

J M. McCormick-Barger, RIII I

l AGENDA FOR MONTICELLO AUDIT l

l (1) Review of Monticello I-D exclusion region calculations. Audit will include the following items:

(a) Engineering procedures / guidelines or technical documents for future exclusion region calculations, and (b) Reload confirmation procedures.

(2) I-D implementation. The purpose of this audit item is to identify schedules and methods for full implementation of Solution I-D in Monticello.

(3) Review of core stability-related procedures. The audit will include all procedures and engineering guidelines related to core stability as follows:

(a) Startup procedures / guidelines to avoid instabilities, (b) Flow-reduction events procedures / guidelines to avoid / recognize core instabilities, and (c) Power distribution controls procedures / guidelines. Interviews with STAS or plant operators may be required to determine the implementation of the guidelines and procedures.

(4) Audit of core stability-related training records. The audit will include the review of training materials and records to determine the adequacy of stability-related training. This audit may include interviews with training officers and/or plant operators.

(5) Power distribution controls implementation. This part of the audit will involve a review of the SOLOMON software system implementation. This review will require an in-plant demonstration and a review of available engineering design records for its installation and coupling to Monticello plant computer variables.

l t

Enclosure i