.' . JUL 1 1 1985 Docket No. 50-409 Dairyland Power Cooperative ATTN: Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:

For the past several years, NRC Headquarters has been working to provide a

~

Health Physics Network (HPN) that will operate reliably. We are now convinced that the current system cannot be made to operate to our satisfaction.

Therefore, a decision has been made to replace.the current HPN telephone system with dedicated comercial circuits. In order to increase the probability of.

being available in an emergency, each of the replacement HPN comercial circuits will be routed through an exchange at a telephone company Central Office different from the office that the facility's circuits are routed through.

Existing HPN service is currently installed, or ordered to be installed, in the EOF, TSC, Health Physics Office and NRC Resident Inspector's Office. The

.new system.will be located only in the EOF and TSC, and will be removed from the Health Physics Office and the Resident Inspector's Office where currently

' installed. In order to make these changes, telephone company personnel will need access to all HPN extensions currently installed and any locations in the EOF and TSC where-an HPN extension was to be located but is not yet installed.

The following is the priority order in which we will have commercial HPN service installed.

1. Install comercial service at those facilities where no HPN service exists.
2. Install commercial service at those facilities where no HPN service exists in the EOF but does in the TSC.
3. Install commercial service at those facilities where no HPN service exists in the TSC but does in the E0F.

, 4. Replace existing HPN special circuitry with commercial service at those facilities that currently have HPN special circuitry. Replacement service will-be in the E0F and TSC,.only. All other locations are to be removed.

l l

l- .

0507160315 850711 9

'3{

r\/ U l ADOCK 0500 gDR

k v

Dairyland Power Cooperative 2 JUL 1 1 $65 More definitive, plant-by plant schedules will be forthcoming when the dates for changes in service are known.

Should you have any questions or need further information Ms. Linda Kers, Emergency Response Coordinator, is the Regional point of contact for assuring

-coordination between your facilities and the telephone companies. She may be reached on (312) 790-5711.

Sincerely,

/ 44

. ind, Director ivision of Radiation Safety and Safeguards cc: J. Parkyn, Plant Superintendent DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition RIII RI RIII RIl I fa jkh Phi ps p' P

e, ' el l o Nore 'us nd TT/Q S

<) f f f 'l 4 7)//b '

s