Forwards Control Room Design Review Supplemental Rept 2 to Final Rept of June 1984, Documenting Completion of plant- Specific Task Analysis & Comparison of Display/Control Requirements W/Control Room Inventory
ML20129C360
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/28/1985
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML20129C367 List:
References
CON-#385-701 NUDOCS 8507160173
Download: ML20129C360 (3)


Text

_ _ . _ _ . .

. f. ,

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 1215)841-4502 VIC E-PR ESID E NT sNeshas R8NG AND NESE ARCM June 28, 1985 i

Mr. W. R. Butler, Chief Licensing Branch No. 2 Docket Nos. 50-352 U.S. Nuclear Regulatory Commission 50-353 washington, DC 20555 Fol. No. NPF-27

SUBJECT:

Limerick Generating Station, Units 1 and 2 Limerick Control Room Design Feview Final Report, Supple m nt No. 2

REFERENCES:

1) Letter, J. S. Kemper to A. Schwencer dated June 25, 1984
2) Letter, J. S. Kemper to A. Schwencer dated November 2, 1984 FILE: GOV 8T l-1 (NRC)

Dear Mr. Butler:

This letter provides the information required to close Limerick License condition 2.C.8 (a) Part 1. Attached is a copy of the Limerick Control Room Design Review (CFDR) Final Report Supplement No. 2. This ,

supplemental report documents the completion of Limerick plant-specific Task Analysis and the comparison of the display and control requirements with the control room inventory. Consequently, the submittal of the attached supplemental report satisfies the above cited license condition.

This report also includes certain Human Engineering Discrepancy (HED) Assessment Sheets which have been revised along with the reason  !

for the revisions. The original versions of these revised HED Assessment Sheets were submitted in the Final and Supplement No. 1 Reports (References 1 and 2 respectively). Also provided are the final i assessment of the four HEDs that were held out for further review in the Final Report (Reference 1).

8507160173 850628 , 0 09 -

PDR ADOCK 05000352 i I F PDR \\

Mr. W. R. Butler, Chief The Safety Parameter Display System (SPDS) human factors survey will be completed en a schedule consistent with SPDS operability.

Sincerely, VWf TJC/la Attachment la626851300 Copy to: See Attached Service List

-. _v - _ _ . _ , -

cc: Judge Helen F. Hoyt (w/ enclosure)

Judge Jarry Harbour (w/ enclosure)

Judge Richard F. Cole (w/ enclosure)

Troy B. Conner, Jr., Esq. (w/ enclosure)

Ann P. Hodgdon, Esq. (w/ enclosure)

Mr. Frank R. Rcmano (w/ enclosure)

Mr. Robert L. Anthony (w/ enclosure)

Ms. Phyllis Zitzer (w/ enclosure)

Charles W. Elliot, Esq. (w/ enclosure)

Zori G. Ferkin, Esq. (w/ enclosure)

Mr. Thcmas Gerusky (w/ enclosure)

Director, Penna. Emergency (w/ enclosure)

Management Agency Angus R. Love, Esq. (w/ enclosure)

David Wersan, Esq. (w/ enclosure)

Robert J. Sugarman, Esq. (w/ enclosure)

Kathryn S. Lewis, Esq. (w/ enclosure)

Spence W. Perry, Esq. (w/ enclosure)

Jay M. Gutierrer, Esq. (w/ enclosure)

Atomic Safety & Licensing (w/ enclosure)

Appeal Board Atomic Safety S Licensing (w/ enclosure)

Board Panel Docket S Service Section (w/ enclosure)

Mr. James Wiggins (w/ enclosure)

Mr. Timothy R. S. Campbell (w/ enclosure)