Discusses Review of 840615 Response to Generic Ltr 84-11 Describing Piping Insp/Replacement Plans for Plant.Insp & Repairs Performed at Unit 1 During Fall 1984 Outages in Compliance W/Generic Ltr 84-11 Guidelines
ML20129C284
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/01/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Beckham J
GEORGIA POWER CO.
References
GL-84-11, TAC-55600, TAC-55601, NUDOCS 8507160103
Download: ML20129C284 (2)


Text

-

July 1,1985

)

Ob Dockets Nos. 50-321 DISTRIBUTION and 50-366 1w L PDR RIngram Mr. J. T. Beckham, Jr.

ORB #4 Rdg GRivenbark Vice President - Nuclear Generation HThompson Gray File Georgia Power Company 0 ELD P. O. Box 4545 EJordan Atlanta, Georgia 30302 BGrimes

Dear Mr. Beckham:

By letter dated June 15, 1984, you responded to our Generic Letter 84-11, describing your piping inspection / replacement plans for Hatch Units 1 and 2.

The results of our review are as follows:

(1) Hatch Unit 1 The details of the inspection plan for Hatch Unit 11984 refueling outage were provided in your submittal dated May 31, 1984. Our subsequent comments on the subject inspection plan were reflected in your actual inspection plan. GPC completed the piping inspection scheduled for the 1984 refueling outage. We reviewed your submittals of inspection results and repairs and concluded that the inspection and repairs performed at Hatch Unit 1 plant during the Fall 1984 outages met the guidelines in Generic Letter 84-11 and the plant could be safely returned to operation for one fuel cycle of 18 months.

(2) Hatch Unit 2 GPC's inspection / replacement plan for Hatch Unit 2 stainless steel piping during 1984 refueling outage meets the guidelines in' Generic Letter 84-11 and therefore, is acceptable. The piping inspection / replacement activity at Hatch Unit 2 was completed, and the plant returned to power on September 4, 1984.

(3)

Future Piping Inspection At this time, we are not ready to comment on your proposed scope and schedule of future piping inspection of replaced or mitigated piping, I

because detailed guidelines for such inspections will be provided in the soon to be issued NUREG-0313, Revision 2.

Sincerely,aca n

~a JCQf. SMajir" John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing cc:

ee next page OR 0 #4:DL GRv 1z

.7/ [enbark;cf 7/

5

/85 9507160103 850701 PDR ADDCK 05000321 0

FDR

Mr. J. T. Beckham, Jr.

Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 cc:

G. F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D.C.

20036 Mr. L. T. Gucwa Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 2625 Birmingham, Alabama 35202 Resident Inspector U.S. Nuclear Regulatory Commission Route 1 P. O. Box 279 Baxley Georgia 31513 Regional Administrator, Region II-U.S. Nuclear Regulatory Commission, 101 Marietta Street, Suite 3100 Atlanta, Georiga 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.

Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 l

i e,s.

s._,.,

-