ML20129B474

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-454/85-26 & 50-455/85-18 on 850603, 19-20 & 24-25.No Violations or Deviations Noted
ML20129B474
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/10/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20129B481 List:
References
NUDOCS 8507150525
Download: ML20129B474 (2)


See also: IR 05000454/1985026

Text

'

O

s

GUL 101933

Docket No. 50-454

Docket No. 50-455

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. K. D. Ward of

this office on June 3, 19-20, and 24-25, 1985, of activities at Byron Station,

Units 1 and 2, authorized by NRC Operating License No. NPF-23 and NRC

Construction Permit No. CPPR-131, and to the discussion of our findings with

Mr. R. Klingler and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~ -

' Original Signed by J. J. Ilarrison

J. J. Harrison, Chief

Engineering Branch-

Enclosure: Inspection Repor,s

No. 50-454/85026 DRS ; and

No. 50-455/85018 DRS

cc w/ enclosure: See next page

8507150525 850710

PDR

O

ADOCK 05000454

PDR

. - _ _ - _ _ _ _ _ _ _ _

_ _ ____ __ __ __ _ Vf o/ j

.,

-

Comonwealth Edison Company 2 JUL 101985

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

Diane Chavez, DAARE/ SAFE

W. Paton, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Stevens, NRR

.

RIII j RIII RI V

d jk .e D i on Harrison

07/09/85 1 ,1

7po/ff 1

o