Text
F June 26, 1985 M8 c%
Dockets Nos. 50-277 DISTRTBtrEON I
<21achke_t_LW JPartlow and 50-278 t
i NRC PDR ACRS-10 L PDR RIngram ORB #4 Rdg Gray File Mr. Edward G. Bauer, Jr.
HThompson RIngram Vice President and General Counsel OELD GGears Philadelphia Electric Company EJordan JKudrick I
l 2301 Market Street BGrimes Philadelphia, Pennsylvania 19101
)
Dear Mr. Bauer:
SUBJECT:
" REC 0MBINER CAPABILITY REQUIREMENTS OF 10 CFR 50.44(c)(3)ii" Generic Letter 84-09 By Generic Letter 84-09 ("Recombiner Capability Requirements of 10 CFR 50.44(c)(3)11".- May 8, 1984), all licensees were provided with certain technical criteriti, which if satisfied, could result in the conclusion that a recombiner capability is not required for a specific facility.
Philadelphia Electric Company-(the licensee) responded to the referenced Generic Letter by letters dated July 31, 1984, and May 1, 1985, which provided documentation to demonstrate that these criteria were satisfied by the Peach Bottom Atomic Power Station, Units 2 and 3.
I 1
Based upon our review of these submittals, we conclude that the licensee's proposed bases for not providing a re. combiner capability for the Peach Bottom facility are acceptable and, therefore, we conclude that no further action concerning Generic Letter 84-09 ("Recombiner Capability Requirements of 10 CFR 50.44(c)(3)ii") is required.
If you have any qu.estions concerning this action, please contact your NRC Project Manager (G. Gears 301-492-8362).
Sincerely, N..w ;&iGaa K 30e3 2. Byaw/..
John F.'Stolz,' Chief Operating Reactors Branch #4 Division of Licensing cc: See next page 0
4:DL OR DL h;cf JStq 6/}()
yy5 h ] g M 05000277 3 850626 P
Mr. E. G. Bauer, Jr.
Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 cc:
~
Mr. Eugene J. Bradley Mr. R. A. Heiss, Coordinator Assistant General Counsel Pennsylvania State Clearinghouse Philadelphia Electric Company Governor's Office of State Planning 2301 Market Street and Development Philadelphia, Pennsylvania 19101 P.O. Box 1323 Harrisburg, Pennsylvania 17120 Troy B. Conner, Jr., Esq.
1747 Pennsylvania Avenue, N.W.
Mr. Thomas M. Gerusky, Director Washington, D.C.
20006 Bureau of Radiation Protection Pennsylvania Department of Thomas A. Deming, Esq.
Environmental Resources Assistant Attorney General P.O. Box 2063 Department of Natural Resources Harrisburg, Pennsylvania 17120 Annapolis, Maryland 21401 Mr. Albert R.- Steel, Chairman Philadelphia Electric Company Board of Supervisors ATTN: Mr. R. Fleishmann Peach Bottom Township Peach Bottom Atomic R. D. #1 Power Station Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Mr. M. J. Cooney, Superintendent Generation Division - Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Anthony J. Pietrofitta, General Manager Power Production Engineering Atlantic Electric P. O. Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station P.O. Box 399 Delta, Pennsylvania 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406