Forwards Insp Rept 50-440/85-43 on 850619-21 & Notice of Violation
ML20129A765
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/11/1985
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20129A769 List:
References
NUDOCS 8507150380
Download: ML20129A765 (2)


See also: IR 05000440/1985043

Text

.

.

JUL 111985

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the special safety inspection conducted by Mr. J. Jacobson of

this office on June 19-21, 1985 of activities at Perry Nuclear Power Plant,

Unit 1 authorized by NRC Construction Permit.CPPR-148 and to the discussion of

our findings with Mr. C. Shuster and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in

violation of NRC requirements, as specified in the enclosed Appendix. A

written response is required. Although the findings are programmatic in

nature, the violation may impact on completed construction. An evaluation of

this potential impact on completed work should be included in your written

response.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

8507150380 850711

PDR ADOCK 05000440 8% ui.iil LICac 1 l 7 E.L. Spcs i: .-f'

G PDR

R. L. Spessard, Director

Division of Reactor Safety

Enclosures:

1. Appendix, Notice of

Violation

2. Inspection Report

No.50-440/85043(DRS)

I

l

See Attached Li_st For Distributio_n_

_

G

-

..

.

The Cleveland Electric Illuminating 2

JUL 111985

Company

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising-

Engineer, Nuclear Licensing and

Fuel Management Section

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

RIII RIII RIII

III

9fravf brHf 91d*6 @

RI $'

bson/jk- Danielson Knop Ha rison Spessard

07/10/85 7/fo/gf 7/jpjgg- q [o 7/j o

i

l

l

J