ML20129A590

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Directors Decision DD-85-08 Per 10CFR2.206,denying Del-Aware 841121 Petition Requesting Requirement That Util Provide Full Disclosure of Intended Sources of Interim Supplemental Cooling Water
ML20129A590
Person / Time
Site: Limerick  
Issue date: 05/17/1985
From: Harold Denton
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20129A559 List:
References
2.206, DD-85-08, DD-85-8, NUDOCS 8506040669
Download: ML20129A590 (2)


Text

.

[7590-01]

U. S. NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-352/353 PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION, UNITS 1 AND 2 ISSUANCE OF-DIRECTOR'S DECISION UNDER 10 CFR 2.206 Notice is hereby given that the Director,.0ffice of Nuclear Reactor Regulation, has denied a Petition filed pursuant-to 10 CFR 2.206 by Del-Aware Unlimited, Inc. (Petitioner)' regarding the Limerick Generating.

' Station, Units'1 and 2 (the facility).

The Petitioner in its November 21, 1984 Petition requested that the

~

Commission require the licensee to provide to the NRC a full disclosure of ~

its intende'd sources of interim supplemental cooling water for the Limerick facility and the environmental consequences thereof prior to issuing a full

p

.powec_ license. The Petition was supplemented by the Petitioner on February 11,

.1985 and March 28, 1985.

The Petitioner repeated its request that :he NRC should review potential sources of interim supplemental cooling water and-suggested that interim sources be considered as permanent alternatives to the currently approved source of supplemental cooling water, specifically, the Point Pleasant Diversion Project.

Upnn review of the information available pertaining to the Petitioner's request, the Director of.the Office of Nuclear Reactor Regulation has denied the Petition.

The reasons for the denial are fully described in a 8506040669 850517 PDR ADOCK 05000352 P

PDR 1

[7590-01] " Director's Decision Under 10 CFR 2.206" (DD ) which is available for public inspection-in the Commission's Public Document Room located at 1717 H Street, NW, Washington, DC 20555, and at the Pottstown Public Library, 500 High Street, Pottstown, Pennsylvania.

A copy of the Decision will be filed with the Secretary for the Commission's review in accordance with 10 CFR 2.206(c). As provided in this

)

regulation, the Decision will become the final action of the Commission twenty-five (25) days after issuance, unless the Commission on its own motion institutes review of the Decision within that time.

Dated at Bethesda, Maryland this 17th day of Nar 1985.

FOR THE NUCLEAR REGULATORY COMMISSION orisuus suced by

_ IL E 8'M 84 Harold R. Denton, Director Office of Nuclear Reactor Regulation.

  • Previously concurred:
  • LB#2/DL
  • LB#2/DL
  • LB#2/DL
  • AD/MCET/DE
  • 0 ELD

' /DLp' EHylton

-REMartin:dh ASchwencer WVJohnston RHoefling ak 04/30/85 04/30/85 04/30/85 05/02/85 05/07/85 0

/85 D/DL g DD/NRR D/Nh HThod)" son dei ut HDetiton 05/f/85-05

/85 05/gj/84 s

t a

3;;l

-,e.

y u,

s L:

- DISTRIBUTION - GREEN TICKET NO. 000155/2.206

~

. 7

^~

2..

-:NRC PDR*. -

Local PDR*'

- NSIC*

~

EDO #155/2~.206;-

EDO. Reading File; WDircks'
RMartin-EHylton-.

LBi2/ Reading

=HThompson/MJambour

. 0 ELD '.

TNovak/P0Brien-WVJohnson.

i

~RHoefling "DEisenh't?

u iHDenton

LMulley,:P-428 #155/2.206 iCMlles,'OPA.

eVYanez, TIDC ASLP-

.ASLAP7

- ACRS-16::-

A i Triurely.

. 4

/

s i.<',

s-

?

w

. f 4

m.

f__

1 3

.\\

x

- m12*L-Gaa-a-me '--

a