ML20129A480

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-213/85-08 on 850325-29 & Notice of Violation.Immediate & Long Term Corrective Actions Committed to During Exit Interview to Correct Recurring Problem in Signal Transmission Should Be Documented
ML20129A480
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/20/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20129A484 List:
References
NUDOCS 8506040621
Download: ML20129A480 (2)


See also: IR 05000213/1985008

Text

_ _ - - - - . - - - - - < -

.:-

,

5,

.

'

=

9

'

MAY 2 01985

i

-

-

a

Docket No. 50-213-

Connecticut Yankee Atomic Power Company

i

ATTN: Mr. J. F. Opeka

i

Senior Vice President - Nuclear

-

Engineering and Operations Group

h

P. O. Box 270

m

Hartford, Connecticut 06101

-

Gentlemen:

.

4

Subject:

Inspection Report No. 50-213/85-08

-

A routine safety inspection was conducted by Mr. A. A. Weadock of our office on

March 25-29, 1985, of the Haddam Neck Plant radiological environmental moni-

m

toring program. Areas that were reviewed included sample collection, control

7

of contractor activities, meteorological monitoring, audits and reports.

,

The inspection indicated that one of your activities was in apparent violation

of NRC requirements. Details are provided in enclosure Appendix A.

You are

5

required to respond to this finding by following the instructions included in

i

Appendix A.

-

a

Additionally, please document in your response the immediate and long term

-

corrective actions committed to during the exit interview to correct the re-

-

curring problem in signal transmission between the meteorological equipment

_E

house and the control room, as discussed in Section 6.0 of the enclosed

_

inspection report.

j

Your cooperation with us is appreciated.

5

m

Sincerely,

j

Original signed By

-]

$N

W A~

g

Thomas T. Martin, Director ()

g

ivision of Radiation Safety

,

and Safeguards

5

-

"

8506040621 850520

$

gDR

ADOCK 05000213

-

PDR

g

i

r

h

0FFICIAL RECORD COPY

IR HADDAM NECK 85-08 - 0001.0.0

[

g

05/03/85

-

'b

'

bO

-

_.

_

-

e

.

.

Connecticut Yankee Atomic. Power Co.

2

Enclosure:

.1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report No. 50-213/85-08

l

cc w/ encl:

.

,

R. Graves, Plant Superintendent

D. 0. Nordquist,' Manager of Quality Assurance

R. T. ~ Laudenat, Manager, Generation Facilities Licensing

' E. J. Mroczka, Vice President, Nuclear Operations

Gerald: Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

-Region I-Docket Room (with concurrences)

Senior. Operations' Officer (w/o encis)

-

Section Chief, DRP

&b

RI:DRSS$O

RI:DRSS h

RI:DR g I

RI:DRSS

Weadock/fi-

Struckmeyer

Shanbaky

Bellamy

05/IT/85

05/ifi/85

05////85

05/g")/85

0FFICIAL RECORD COPY

-IR HADDAM NECK 85-08 - 0002.0.0

05/03/85