Responds to NRC Re Violations Noted in Insp Repts 50-361/96-09 & 50-362/96-09.Corrective Actions:Inverter Verified Operable & Modified Applicable Surveillance Procedure to Include Acceptance Criteria
ML20129A420
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/15/1996
From: Nunn D
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-FIN-D-1879 NUDOCS 9610220140
Download: ML20129A420 (2)


Text

_-

i

.i r -

SOUIHERN CALIFO*NIA N

EDISON.

M0/;""

l l

An WISON INTU%4TIONAL Catany

.y f

LOctober 15, 1996 e

i e

w

.U.'S. Nuclear R0gul'atory Commission Attention: Document Control Desk j

Washington,.D.C._

20555

Dear 1 Sir:

[

i l

Subject:

Docket Nos. 50-361 and 50-362 Reply to a' Notice-of: Violation-(50-361/96-09-01) l San Onofre Nuclear Generating Station, Units 2 and 3 l'

References:

1.

Letter, Mr. J. E. Dyer (USNRC) to

[

Mr. Harold B. Ray (Edison), dated l

September 24, 1996 2.

Letter, Mr. R. W. Krieger (Edison) to Document l

Control Desk (USNRC), Licensee Event Report No. 2-96-006, dated September 25, 1996 l

Reference 1. provided the results of an NRC inspection (50-361/96-09 and 50-362/96-09) conducted by Messrs.

J. A. Sloan, J.

J. Russell, D. L. Solorio, and D. G. Acker from July 28 through September 7, 1996, at the San Onofre Nuclear Generating Station, Units 2 and 3.

The enclosure to Reference 1.

transmitted'a Notice of Violation.

This letter provides Edison's l

I'

' reply'to'the subject Notice of Violation.

i The Notice of Violation in Reference 1. contained one violation related to a failure to declare a vital AC inverter inoperable,

.as~ required by Technical Specifications, when it was identified j-Lthat output voltage was outside the acceptance criteria of a i

surveillance requirement. _The Notice also states, "Your response may, reference or include previously docketed correspondence, if

_i the correspondence adequately addresses the required response."

. Edison's failureitolfollow Technical Specifications, as they

/ 0) relate <to this event, has been'reportedLto the USNRC in Licensee

Event Report (LER) No. 2-96-006 (Reference 2.).

Reference 2.

_provides_the reasons-for_the violation (cognitive personnel

((}fdT/

error),- the corrective steps which have been taken (inverter

' verified operable,-applicable surveillance procedure modified.to 961'0220140 961015 7

4 n4[

PDR ADOCK 05000361 l

P. O,Ibx 128 '

k

' San Cleim:nte, CA 92674@28 '

- 714-368 1480-I^ar 714-%81490 '

/

m

l q'

)

I Document Control Desk ;

i include appropriate acceptance criteria), and the. corrective steps'that will be taken (occurrence to be reviewed with l

{

operating crews).

Full compliance was achieved on the discovery date, August 26, 1996, when the affected inverter was verified to f

be operable by measuring.its output voltage with a digital

.multimeter and confirming output voltage was within the 118 to 4

122.vAC band.

i If you have'any further~ questions, please contact me.

j 3

)

Sincerely, j

f

\\

l a

h l

c i

t I

i l

i cc:

L. J. Callan, Regional Administrator, NRC Region IV

]

J. E. Dyer, Director, Division of Reactor Projects, NRC l

Region IV i

K. E.

Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV i

J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 and 3 M. B.

Fields, NRC Project Manager, San Onofre Units 2 and 3 j