Submits Repair Package for Core Spray Piping to Expedite Review Schedule of Repair Package If It Becomes Necessary to Install Repair
Date released: 05/22/2020 Download: ML20129A406


Fabrication of Core Spray Line Downcomer Clamp.
ML20129A473
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/11/1995
From: Travato J
GENERAL ELECTRIC CO.
To:
References
Download: ML20129A473 (22)
Core Spray Sparger Downcomer Modification.
ML20129A451
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/11/1996
From: Trovato J
GENERAL ELECTRIC CO.
To:
References
Download: ML20129A451 (14)
Core Spray Line Downcomer Repair Seismic Rept Summary for Peach Bottom Atomic Power Station,Unit 2,Mod P00335.
ML20129A430
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/08/1996
From: Gleason T
GENERAL ELECTRIC CO.
To:
References
Download: ML20129A430 (4)
Core Spray Line Downcomer Repair Hardware Stress Assessment Rept for Peach Bottom Atomic Power Station Unit 2,Mod P000335.
ML20129A410
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/22/1995
From: Gleason T
GENERAL ELECTRIC CO.
To:
References
Download: ML20129A410 (8)
Submits Repair Package for Core Spray Piping to Expedite Review Schedule of Repair Package If It Becomes Necessary to Install Repair
ML20129A403
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/03/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20129A403 (32)