NSD-NRC-96-4831, Forwards non-proprietary Rev 0 to WCAP-14644, AP600 Functional Requirements Analysis & Function Allocation & non-proprietary Rev 1 to WCAP-14651, Integration of Human Reliability Analysis W/Human Factors Engineering Design..

From kanterella
(Redirected from ML20128R051)
Jump to navigation Jump to search
Forwards non-proprietary Rev 0 to WCAP-14644, AP600 Functional Requirements Analysis & Function Allocation & non-proprietary Rev 1 to WCAP-14651, Integration of Human Reliability Analysis W/Human Factors Engineering Design..
ML20128R051
Person / Time
Site: 05200003
Issue date: 10/09/1996
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128R055 List:
References
RTR-NUREG-0711, RTR-NUREG-711 NSD-NRC-96-4831, NUDOCS 9610210277
Download: ML20128R051 (2)


Text

. . . . .- - . _- - . _ - - . - _ . - .

. v-e Q

d i

Westinghouse Energy Systems b 355 Pittsbutgh Pennsylvanta 15230-0355 Electric Corporation NSD-NRC-96-4831 DCP/NRC0614 l 4 Docket No.: STN-524)03 _ l October 9,1996 Document Control Desk i U.S. Nuclear Regulatory Conunission Washington, D.C. 20555 ATTENTION: T.R. QUAY

SUBJECT:

COMPLETION OF WESTINGHOUSE ACTIVITIES RELATED TO NUREG

! 0711 ELEMENTS 3,4 AND 6

References:

1) NSD-NRC-96-4784 (DCP/NRC0585), dated August 22,1996.
2) NSD-NRC-964809 (DCP/NRC0593), dated August 29,1996.

Dear Mr. Quay:

t As described in Reference 1, the following WCAPs are enclosed: ,

WCAP-14644, Revision 0, "AP600 Functional Requirements Analysis and Function ,

Allocation." Submittal of this WCAP closes DSER OITS items 1323 through 1337, 2465,

! 2467 and 2468. Item 2466 is NRC action related to Task Analysis, not Function Allocation.

Westinghouse activities related to NUREG 0711 Element 3 are complete.

3 WCAP-14651, Revision 1, " Integration of Iluman Reliability Analysis with Human Factors Engineering Design Implementation Plan." Submittal of this WCAP closes DSER open items 1338,1339, and 1348 through 1353. This completes Westinghouse activities related to NUREG 0711 Elements 4 and 6.

- WCAP-14645, Revision 1, " Human Factors Engineering Operating Experience Review Report for the AP600 Nuclear Power Plant" is being revised and will be submitted by October 18, 1996. Submittal of this WCAP will close DSER OITS items 1316 through 1322 and 2063.

1 4

9610210277 961009 PDR ADOCK 05200003 i i .l A PDR 5

_ i T

d

e.<

NSD-NRC-96-4331 DCP/NRC0614 October 9,19%

i In summary, Westinghouse activities for the NUREG 0711 Elements are complete as follows:

1 Reference 1 2 WCAP-14645 Revision I to be submitted by October 18, 1996.

3. This transmittal (DSER OITS item 2466 is NRC action.)

4 This transmittal 5 Reference 1 6 This transmittal 7 Reference 1 8 Reference 1 9 Reference 1 10 Reference 2

[

This transmittal completes the Westinghouse activities for Elements 3,4, and 6 which is sufficient for the NRC to complete their FSER efforts related to all NUREG 0711 elements except Element 2.

Please contact Robin K. Nydes at (412) 374-4125 if you have any questions regarding these DSER Chapter 18 WCAP submittals.

Brian A. McIntyre, Manager i Advanced Plant Safety and Licensing

/nja cc: W. Huffman, NRC (9E)  !

J. Bongarra, NRC (IE) l H. Li, NRC (IE)

J. O'Hara, BNL (IE)

J. Higgins, BNL (IE) '

N. Liparuto, Westinghouse (w/o attachments) 2940A