OPERATING DATA REPORT DOCKET NO 50-369 DATE 0ctober 15. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346
-1. Unit Nase: McGuire 1 1
- 2. Reporting Period: September 1, 1996-September 30,1996
)
- 3. Licensed Thermal Power (Mt):
3411
,4. Waseplate Rating (Bross Me):
1305+
Notes *Maseplate Rating i
S. Design Electrical Rating (Net Mel
!!B0 (6 toss NWel calculated as
- 0. Maxleus Dependable Capacity (6ross Me):
!!71 1450.000 MA x.90 power
- 7. flaxinus Dependable Capacitt (Net Me):
!!29 factor per Page 111,
- 8. If Changes Occur in Capacity Ratings (Itees Nuaber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net Me):
10.ReasonForRestrictions,Ifany:-
This Month Yr.-to-Date Cumulative-
!!. Hours In Reporting Period' 720.0 6575.0 130031.0
- 12. Number Of Hours Reactor Was Critical 720.0 5996.5
--94435.8
- 13. Reactor Reserve Shutdown Hours
- - - j
- 14. Hours Generator On-Line 720.0
" 04.8 93436.3 i
- 13. Unit Reserve Shutdown Hours
--0--
-o--
--0--
la. Gross Thersal Energy Generated ( MH) 2452128 1h81269 294635371
- 17. Gross Electrical Energy 6enerated (MH) 833323 6783933 10!!59213
- 18. Net Electrical Energy Benerated (N W 801443 6519156 96666727
- 19. Unit Service Factor 100.0 89.8 71.9 P.O. Unit Availability Factor 100.0 89.8 71.9
- 21. Unit Capacity Factor.(Using MDC Net) 98.6 87.8 64.9
- 22. Unit Capacity Facter (Using DER Net!
94.3 84.0 63.0
- 23. Unit Forced Outage Rate 0.0 1.0 12.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):-
j Refuelinn - Janunrv 31. 1997 - 100 davs
'l
- 25. If Shut Dcun At End Of Report Period. Estimated Date of Startups,
- 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION j
i 9610210213 961015 PJR ADOCK 05000369 R
PDR i
]
OPERATING DATA REPORT DOCKET NO 50-369 UNIT McGuire 1 DATE0ctober 15. 1996 COMPL' (D BY R.A. Williams TE. '.iONE 704-382-5346 MONTH Septesber,1996 ER AVERASE DA!LY POWER LEVEL QM AYERAGE DAILY POWER LE WL (MWe-Net)
(MWe-Neti 1094 17
!!!2 2
1097 18 1116 3
1099 19 1127 4'
110!
20 1127 5
1097 21 1129 6
1101 22 1128 7
!!04 23 1128 8
!!05 24 1129 9
1104 2h
!!28 10 1104 26 1127
!!02 27 1129 12 1102 28 1129 13 1104 29 1127 14 1106 30
!!!9 13
!!09 16 1111 i
um
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME Mwuixt; 1 DATE 10/1d/96 REPORT MONTH September 1996 COMPLETED BY x.
A.
williams TELEPHONE pueJ-Juz-dde6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S a
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent q Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction 4-Other (Explain)
File ( M EG-0161)
E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G "perator Error H-Other
1 l
l MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 1 2.~
Scheduled next refueling shutdown: January 1997 3.
Scheduled restart following refueling: May 1997 TE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l l
4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
Ifyes, what will these be?
If no, has reload design and core configuration ben reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important liceraing considerations (new or different design or supplier, unreviewed design or performance ana;y methods, significant changes in design or new operating procedures).
7.
Number of Fuel assembPea (a) in the core: j93 (b) in the spent fuel pool: 22)3 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -
1
' 9.
Projected date oflast refueling which can be accommodated by presern license capacity: March j
2006***
i DUKE POWER COMPANY DATE: October 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 1
]
DOCKET: 50 369 UNIT: McGuire i Date:
10/15/ %
NARRATIVE
SUMMARY
MONTH: September,1996 McGuire Unit 1 began the month of September operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Williams Telephone:(704)- 382-5346
OPERATING DATA REPORT DOCKET NO 50-370 DATE 0ctober 15. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Nase: McGuire 2
- 2. Reporting Period Septesber 1, 1996-September 30,1996
- 3. Licensed Thereal Power (M il 3411
- 4. Naseplate Rating (Bross MWe):
1305e Notes *Naeeplate Rating
- 9. Design Electrical Rating (Net We):
1180 (6ross Wel calculated as
- 6. Maxista Dependable Capacity (Gross Wels 1171 1450.000 MVA x.90 power
- 7. Maxinus Dependable Capacity (Net Wel 1129' factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
1
- 9. Power Level To Which Restricted, if Any (Net Melt
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Date Cuaulative
- 11. Heurs in Reporting Period 720.0 6575.0
!!0327.0
- 12. Nuaber Of Hours Reactor Was Critical 720.0 4658.1 86413.7
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
- It. Hours Generator On-Line 720.0 4622.2' 05353.0 13.UnitReserveShutdownHours -
--0--
--0--
la. Gross Thereal Energy Ser.erated (MWH) 2451632 15369424 200609073
- 17. Gross Electrical Energy Generated (MWHI 833067 5308772 97812048
- 18. Net Electrical Energy 6enerated (MWH) 801381 5084905 93797342
- 19. Unit Service Factor 100.0 70.3 77.4
- 20. Unit Availability Factor 100.0 70.3 77.4
'21. Unit Capacity Factor (Using RDC Net) 98.6 68.5 74.6
- 22. Unit Capacity Factor (Using DER Net) 94.3 65.5 72.1
- 23. Unit Forced Outage Rate 0.0 17.9 7.1
-24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Peport Period. Estinated Date of Startup:
- 24. Units in Test Statur, (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
OPERATING DATA REPORT DOCKET NO 50-370 UNIT McGuire 2 DATE 0ctober 15. 1996 COMPLETED BY R.A,Williaas TELEPHONE 704-382-5346 MONTH Seotenber,1996
- Q3y, AVERAGE DAILY POWER LEVEL QAl AVERAGE DAILY POWER LEVEL IMWe-Net)
(MWe-Net) 1 1102 17 1116 2
!!04 18 1113 3
!!05 19 1114 4
1107 20 1117 5
1t02 21 1120 6
!!07 22 1119 7
!!!0 23
!!!9 8
till 24 1121 9
1110 25 1120 10 1110 26 1120 11 1107 27
!!24 12
!!07 28 1124 13 1107 29
!!21 10
!!09 30 1120 15 litt 16 1114 i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME mwuix4 2 DATE lu/1d/36 REPORT MONTH September 1996 COMPLETED BY K.
A.
- Williams, TELEPHONE t/us1-362-d346 (1)
(2)
(3)
(4)-
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent U Sneets For Licensee C-Refueling 3-Automatic Scram
( N G-0161))
Event Report (LER D-Regulaton Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
~
e l
.e 9
MONTHLY REFUELING INFORMATION REOUEST i
j-1.
Facility name:
McGuire. Unit 2 2.
Scheduled next refueling shutdown: September 1997 i
)
3.
Scheduled restart following refueling: December 1997 i
2 i
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 4
THROUGH 6 WILL Nr LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
j If yes, what will these be?
I If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
j i
j 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or
}
performance analysis methods, significant changes in design or new operating procedures).
j
{
7.
Number of Fuel assemblies (a) in the core: 191 l-(b) in the spent fuel pool: 269 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --
9.
Projected date oflast refueling which can be accommodated by present license capacity:
{
December 2003 j
i DUKE POWER COMPANY DATE: October 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
...... ~.. - -...
- -. _. ~... ~.. -.. -.
... - -.... ~
DOCKET: 50-370 UNIT: McGuire 2 Date:
10/15/96 NARRATIVE
SUMMARY
MONTH: September,1996 McGuire Unit 2 began the month of September operating at 100% full power. The unit operated at or near 100% full power for the entire month.
L Prepared by: R. A. Williams Telephone: (704)- 382-5346 a.
~