Forwards BNL Technical Review of Automatic Depressurization Sys.Review Addresses Sys Design,Sys Hardware & Procedures for Operation & Maint.Requests Comments & Actions Taken to Address Open Items Listed in Section 12.1
ML20128Q891
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/30/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20128Q893 List:
References
NUDOCS 8506040340
Download: ML20128Q891 (2)


Text

. _ - -

,1

' ',,. e.

MAY 30 7985 Docket Nos. 50-352 50-353 Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Technical Review of the Automatic Depressurization System by Brookhaven National Laboratory This_ refers to the Technical Review conducted by NRC Region I contractors from Brookhaven National Laboratory (BNL) on April 22 - 26, 1985, at the Limerick -

Gene' rating -Station, Limerick, Pennsylvania. The results of this review were discussed at an exit meeting on April 26, 1985 with Mr. G. M. Leitch of your staff.

This review addressed the areas of system design, preoperational testing, system hardware, and'the procedures for operation,: maintenance and surveillance associ-ated with the Automatic Depressurization System. The scope and extent of this review was determined using the results of a study performed by BNL of the Limerick Probabilistic Risk Assessment (PRA). The BNL Technical Review Report,

.which is enclosed, also reviews the status of items identified in earlier Technical Reviews of the Emergency Service Water System and the AC and.DC Electric Power Systems.

Accordingly, to obtain your perspective regarding the use of the PRA in this fashion, you are requested to respond to this letter, providing your comments and also providing any actions taken to address the open items listed in Section 12.1 of the enclosed report. This response is requested within 30 days of the date of this letter and is exempt from the Office of Management and Budget's clearance procedures under the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation _is appreciated.

Sincerely, Original Signea Byi kk Mk Nb52 Samuel J. Collins, Chief P

PDR Projects Branch 2, Division o Reactor Projects

$f

Enclosure:

BNL' Technical Review Report 0FFICIALRECORDjOPY BEALL5/21/85 - 0001.0.0 1 \\

05/20/85 l

s

,4 Philadelphia Electric Company 2

cc w/ encl:

V. S. Boyer,-Senior.Vice President, Nuclear Power

. John S. Kemper, Vice President, Engineering and Research.

~

G. Leitch,. Station Superintendent Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire, Assistant General Counsel Public Document-Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

-NRC Resident Inspector

. Commonwealth of Pennsylvania bec w/ encl:

Region I Docket Room (with concurrences)

J. Gutierrez

.S. Collins

^

R. Gallo L. Briggs, DRS

-J. Higgins, BNL

'K. Murphy,--DRS L. Bettenhausen, DRS T. Murley, RI r

.[RI:DRP P

-Beall/jm ins 0FFICIAL RECORD COPY BEALL5/21/85 - 0002.0.0 05/20/85

%