ML20128Q850

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Aug 1996 for Catawba Nuclear Station
ML20128Q850
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/1996
From:
DUKE POWER CO.
To:
Shared Package
ML20128Q839 List:
References
NUDOCS 9610210191
Download: ML20128Q850 (1)


Text

-

.e 4

CATAWBA NUCLEAR STATION MONTHLY OPERAT1ho STATUS REPORT August 1996 1.

Personnel Exposure -

The total station liquid re;' sse for August has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for August has been compared with the Technical Specifications !..aximum annual dose commitment and was less than 10 percent of this limit.

9610210191 960930 PDR ADOCK 05000413 R

PDR