ML20128P651
| ML20128P651 | |
| Person / Time | |
|---|---|
| Site: | 07001252 |
| Issue date: | 06/06/1996 |
| From: | EDLOW INTERNATIONAL CO. |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20128P654 | List: |
| References | |
| NCS-E-14, NUDOCS 9610180041 | |
| Download: ML20128P651 (1) | |
Text
.
OW3%q mamme k./
u Edlow International Company 1666 Connecticut Ave. N.W., Suite 201 M
Washington, D C. 20009 U.S.A.
Tel (202 p 483-4959 v
Fax (202) 483-4840 U."SNiIcTear Regulatory Commission Date: June 6,1996 Division of Safeguards and Transportation our Ref: N C S-E-M, f
Washington, D.C. 20555 date to April 22 Attn: Ms. Gloria Bennington (Mail Stop (0-6-E-6) 4 In accordance with the Convention on the Physical Protection of Nuclear Material l
and the NRC Final Rule of March 26,1987, Edlow International Company hereby makes the following notification of upcoming shipment:
Shicoer: Nuclear Cargo Service c/o Receiver:
Framatome Cogema Fuels Energiewerke Nord GmbH Commerial Nuclear Fuel Plant Sitz Rubenow Mt. Athos Road, Route 726 17507 Lubmin, Germany Lynchburg, VA 24504 Phone: 804-385-2000 Carrier: Atlantic Container Lines Carrier:
Priority Freight Systems (Ocean) 50 Cragwood Road (U.S.
1305 Cavalier Blvd.
Sr.uth Plainfield, NJ 07080 Inland)
Chesapeake, VA 23323 Phone: 908-668-5543 Phone: 804-485-1094 Physical Descriotion: Uranium hexafluoride, fissile. Gross Weight: 97,524 kgs; Net Weight: 43,524 kgs; U Weight:
21,232 kgs; Um Weight 454 kgs. Weights approximate. Enrichment less than 20.00% Low enriched fuel elements contained in 30 packages; 6 packages per 20' container; 5 x 20' containers.
l Mode (s) of Transoort: As above, ocean and truck.
Transfer Points: Bremerhaven, Germany for loading onto Atlantic Container Lines' vessel "Heidelberg Express"; Norfolk, VA for loading onto trucks for shipment to Framatome Cogema Fuels in Lynchburg, VA.
Routes to be used: U.S. inland routing will be in compliance with 49 CFR 177.825.
Shloment Details: ETD Bremerhaven May 28,1996; ETA Norfolk, VA June 9; ETD i
f Norfolk June 11-13; ETA Lynchburg June 12-14,1996. ggg The shipper certifies that the necessary arrangements have been made for pick-up and delivery of the above material and that the receiver has agreed to receive it. Both receiver and shipper have also agreed to the shipment dates as specified above.
170009 2
"F#'
2 8
4 96 6 6 5
r 1
C PDR j