ML20128P572

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-271/93-02 on 930103-0206 & Notice of Violation
ML20128P572
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/18/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20128P574 List:
References
NUDOCS 9302250009
Download: ML20128P572 (3)


See also: IR 05000271/1993002

Text

- . - -

- - _ - . -

..

.

- - _ - . - .

.

-

-.

b * ,

%.

.

4

FE8181993

Docket No. 50-271

Mr. James P. Pelletier

Vice President, Engineering and Manager of Operations

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

,

Ferry Road

'

Brattletoro, Vermont 05301

Dear Mr. Pelletier:

SUBJECT:

VERMONT YANKEE INSPECTION 93-02

This refers to the resident safety inspection conducted by Messrs. H. Eichenholz and

P. Harris on January 3 February 6,1993, at the Vermont Yankee Nuclear Power Station,.

Vernon, Vermont. The preliminary results of the inspection were discussed with

Mr. D. Reid at the conclusion of the inspection. The inspection focused on issues important

to public health and safety, and consisted of performance oh?crvations, the conduct of control

room operations, maintenance, and independent verifications of safety system status.

.

Our observations during this period indicated that the plant was operated safely However,

your staff failed to preclude the recurrence of inservice test deficiencies over the past two

years, which most recently caused a missed Technical Specification surveillance. This

failure to implement effective corrective action was not in full compliance with NRC

requirements, as set forth in the attached Notice of Violation.

Since this violation had been previously reported in Licensee Event Report 92-20, and your

corrective actions were reviewed during this inspection, no response to the enclosed Notice is

L

required.

i

Your cooperation with us is appreciated.

Sincerely,

SIGNED E -

$

. Jai es C. Linville, Chief-

,

'

^ Reactor Projects Branch 3

Division of Reactor. Projects

9302250009-930218

PDR

ADOCK-05000271

O

PDR

l

)

m

f

.

.

.-

-

. -

-

.- - -

-.

__

_

.-

.-

_. .

_

.

. _ .

. _ - .

'

'.

s,

,

.,

Mr. James P. Pelletier

2

FEB 181993

Enclosures:

1. Notice of Violation

2. NRC Inspection Report 93-02

i

cc w/encls:

D. Reid, Plant Manager

J. Thayer, Vice President, Yankee Atomic Electric Company

L. Tremblay Senior Licensing Engineer, Yankee Atomic Electric Company

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

,

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Of6ce of the Attorney General, Commonwealth of Massachusetts

'

R. Gad, Esquire

G. Bisbee, Esquire

R. Sedano, Vermont Department of Public Service

T. Rapone, Massachusetts Executive Of0ce of Public Safety

Public Document Room (PDR)

Local Public Docurnent Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2 copies)

NRC Resident inspector

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

._

-

.

.-

._

..-

i.

s,

l

l

FEB 181993

'

Mr. James P. Pelletier

3

bec w/ encl:

Region I Docket Room (w/ concurrences)

DRS/EB SALP Coordinator

i

J. Linville, DRP

E. Kelly, DRP

11. Eichenholz, SRI - Vermont Yankee (w/ concurrences)

V. McCree, OEDO

D. Dorman, NRR

W. Butler, NRR

Allegations Coordinator Section 4.1.1 (RI-92 A-0235)

1

l

bec w/ Letter Enclosure 1, and Executive Summary Only:

T. Martin, RA

W. Kane, DRA

C. Hehl, DRP

.

J. Wiggins, DRP

I

R. Cooper, DRSS

W. Hodges, DRS

W. lanning, DRS

W. Ruland, DRS

L. Bettenhausen, DR.

J. Joyner, DRSS

'

D. Holody, EO

,

)(, (n h

L

ry

4,} fis t'

,L s 38 V'1

l6[

"

CM

(

go

M*'

@[

av

,

RI:DRP

RI:DRP

RI:D

Eichenholz/meo

Kelly

Linville

2/16/92

OFFICIAL RECORD COPY

A:VT

. iEO