ML20128P351

From kanterella
Jump to navigation Jump to search
Advises That Changes & Revs to Emergency Plan Consistent W/Provisions of 10CFR50.54(q) & Acceptable.Listed Comments Should Be Evaluated & Considered for Possible Inclusion in Next Emergency Plan Rev
ML20128P351
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/28/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8506030513
Download: ML20128P351 (2)


Text

&

~

'.,a MAY 2 81N5 Docket: 50-267 Public Service Company of Colorado i

ATTN:

0.-R. Lee, Vice President Electric Production P. O. Box 840 Denver, Colorado 80201 Gentlemen:

.The NRC staff reviewed the changes made to the Emergency Plan, namely to Section 5 - Issue 7, Section 6 - Issue 8, and Section 9 - Issue 5, and determined that your revisions and changes to the Emergency Plan, dated through January 15, 1985, do not decrease the effectiveness of your emergency response capabilities, and that your Emergency Plan continues to meet the standards of 10 CFR 50.54(q).

There are, however, several comments, as discussed during our May 14, 1985, telephone conversation,_which should be evaluated and considered for possible inclusion in your next. revision of the Emergency' Plan:

.1.

Block diagrams describing the structure of your emergency response organization do not include intermediate level organizational titles, for example, Figure 5.2-2 outlines the function " Personnel Accountability," instead of specifying a title, such as " Personnel

~ Accountability Officer."

2.-

Section 7 does not mention the Executive Command Post, which apparently is an Emergency Response Facility, as described by Paragraph 5.3.1.

3.

. Figure 5.2-3 does not indicate structural relationships among the various Emergency Response Centers.

No response to this letter is requested.

If you have any questions, please contact Mr. Nemen M. Tere of this office at (817) 860-8129.

Sincerely, Orfr.inct Signed By E. H. Ahn:en E. H. Johnson, Chief Reactor Project Branch I cc(seenextpage)

RIV:EPSC#'

C:EPS P B

0:

SP&ES RPB1 Y pcNMTerc:l)t JBBaird REHall RLB t REIreland EHJohnson S /c3/85 4/n/85 f/f85 gG/) /85 S/.86/85 D/25/85 8506030513 850528

[

d

/

p[o PDR ADOCK 05000267 f,

F PDR k

d

i Public Service Company of Colorado 2

cc:

J. W.-Gahm,LManager, Nuclear Production Division

_g Fort St.-Vrain Nuclear Station 16805 WCR 19

-Platteville,. Colorado 80651 L. Singleton, Manager, Quality Assurance Division

.(same address)

Colorado Radiation Control Program Director bcc to DMB (A045)

RPB1 R. P. Denise, DRSP Resident Inspector R. D. Martin, PA Section Chief (RPB1/SPES)

E. Haycraft, LA P. Wagner, RPB1 R. L. Bangart, DRSS D. Powers, RPB1 N. Terc EP&RPB J. Baird RIV File l

l t