Forwards Revised SALP Rept 50-271/84-25 for May 1983 - Oct 1984 & Detailed Evaluation of Util 850301 Comments.Salp Conclusions Unaffected.Extensive Corrective Actions to Correct App R Violation Recognized
ML20128P231
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/28/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20128P236 List:
References
NUDOCS 8506030491
Download: ML20128P231 (4)


See also: IR 05000271/1984025

Text

,

.

_ _ _ _ _ - - _ _ _ _

_

_

.,

.

+

,w.

.t

-

.

!

MAY 2 81985

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. W. F. Conway, President

and Chief Executive Officer

RD 5, Box 169

Ferry Road

Brattleboro, Vermont

05301

Gentlemen:

Subject:

Systematic Assessment of Licensee Performance (SALP) and Mr. W. P Murphy's

Letter, FVY 85-22, March 1, 1985

This refers to the SALP for the Vermont Yankee Nuclear Power Station, conducted

by_this office on December 11, 1984 and discussed with you and your staff at a

meeting on January 25, 1985. The list of meeting attendees is attached as Enclo-

sure 1.

The NRC Region I SALP Report as amended is provided as Enclosure 2 and

covers the period May 1, 1983 through October 31, 1984.

Mr. Murphy's response

date.d March -1,1985, submitted pursuant to our letter of December 21, 1984, pro-

vided comments on the SALP Report. These letters are provided as Enclosures 3

and 4.

"

Our overall assessment of your performance of NRC licensed activities at the Ver-

mont Yankee facility is that there is a generally conservative approach taken to

assure safety in plant operations.

Additional strengths in your management con-

trols were_found in the planning and control of outage activities and design

changes, implementation of effective housekeeping and security programs, completion

of licensing actio1s, and in your preventive maintenance and operational surveil-

lance programs.

Significant improvements were evident in the emergency prepared-

ness area.

,

Some performance shortcomings were observed, however, in the areas of radiation

protection, fire protection and maintenance.

There were numerous personnel errors

noted during the performance of routine operations.

Increased management attention

is warranted to assure the personnel error trend does not continue.

Additionally,

the policy for_ operation under apparent anomalous conditions should be reviewed

and strengthened as necessary to assure that conservatism in plant operations is

maintained at previously observed levels.

Based on our discussions, continued NRC

and Vermont Yankee management attention will be directed to these areas to assure

identified weaknesses have been corrected.

In the meeting of January 24, 1985, we discussed our assessment of your regulatory

performance and received your comments on the SALP Program and our assessment.

L

We have considered your letter of March 1, 1985 and found that there are some dif-

ferences of opinion.

Accordingly, we are providing you our detailed evaluation

in Enclosure 5.

Our SALP conclusions have not been effected.

However, for the

purposes of clarification of the SALP report, we have added the fifth sentence on

Page 26.

In response to your letter comment Item (2) on the Appendix R violation,

we do not agree with your comments in general and, in particular, with your posi-

tion that your response to the findings has been timely.

However, we do recognize

k$$$$$&

__&

m

rc

.-

--

__

_-

,r

.

o

.

a.

.

.

, , -

' Vermont Yankee Nuclear Power

2

Corporation

MAY 2 81985

Ltheextensivecorrectiveactionssubsequentlyimplementedbyyoutocorrectthe'

'

deficiencies: identified in the violation._ We consider that our meeting and sub-

sequent interchange of information were beneficial and improved mutual understand-

ing of-your activities and our regulatory program.

-In accordance with 10LCFR 2.790(a), a copy of this letter and'its enclosures will

'

be'placed-in'the.NRC.Public Document Room.

No reply to 'this letter is required.

Your actionsEin response to the NRC Systematic Assessment of Licensee' Performance

'

.

will be reviewed during future inspections of your licensed activities.

.Your cooperation.is appreciated.

Sincerely,

L

oristnal aistedtF

Thoens F. Wurley

Thomas E. Murley

Regional Administrator

Enclosures:

.

1.

SALP Management. Meeting Attendee's

_ _

2 1 -NRC Region I Systematic Assessment of Licensee Performance,_

Vermont Yankee' Nuclear Power Station, December 11, 1984

. with Amendment-

13.

SNRC Letter,'R. W.:Starostecki to W. P. Murphy, December - 21, 1984

4. . 7 Vermont Yankee Nuclear Power Corporation Letter, W. P. Murphy to

R. W._ Starostecki (NRC ~ Region I), SALP ' Report Co1Reents,

.

March 1,~1985

5.

NRC Review of SALP Report Comments Provided in Vermont Yankee

,

1 Nuclear Power Corporation Letter, March 1, 1986

^

cc w/encis:

W. P.' Murphy,1Vice President and Manager of Operations

R. W. Capstick, Licensing Engineer

'J. P. Pelletier, Plant Manager

_

Donald Hunter,.Vice President

.

'

1 Cort Richardson,. Vermont Public Interest Research Group, Inc.

i

c

--Chairman Palladino-

'

. Commissioner Roberts

'

Commissioner Asselstine-

^

Commissioner Bernthal

~ Commissioner Zech

.

1

'Public Document Room (PDR)

.

Local Public Document Room (LPCR)

1

!'

. Nuclear. Safety Inforntion_ Center (NSIC)-

NRC Resident Inspector

State of New Hampshire

State-of Vermonte

,

.

4

+

-

,.

, . ,

e

+- +

.n,

-

...n.+

- - , , . - - n

..n,-,

v wa-e

..~--,-w--,--

~nm,

v,-,,

,n,,,

. ~ , . , -

,.a.nr

-- ,, . - . . , - - , , , w-

,- - - , - . ,

--

..

.

..

.

-,

.-

Vermont Yankee Nuclear Power

3

MAY 2 81985

Corporation

bec w/encls: .

Region I Docket Room'(with concurrences)

' Senior Operations Officer (w/o encis)

T.' Murley, - RI

-

K. Abraham, RI (2 copies)

D. Holody; RI

L.- Tripp

'RI SALP Management Meeting. Attendees

i:

R

P

'R

RP

R

P

DRS

RI)

la/meo

ripp

vi.iOS

4 , p

/s. 4n ingereaynpSst.osgec

i

e

'

0FFICIAL RECORD COPY

V

,

- . - . .

.- .

.

-

.-

.

.

i :-

-

-

-

(.

r

- '":

y

.

.

.

'

ENCLOSURE 1

-

-U.S. NUCLEAR REGULAT0liY COMISSION

SALP MANAGEMENT MEETING AIIENDEES

,

'

' Lice'nsee:

Vermont Yankee Nuclear Power Corporation'

'

RD 5, Box 169

,

.

Brattleboro,.. Vermont

05301.

-

o

%

Facility Name:

Wrmo'ntYankee-NuclearPowerStation

Meeting at:

Region'I 0ffice, King'of Prussia, Pa.

Meeting conducted: -January 24, 1985

.l.

LLicensee Attendees

. Vermont Yankee Nuclear Power Corporation

.W.-F.-Conway, President and Chief Executive' Officer-

'

D. E. Hunter,:Vice President of.0perational Projects

S. J.' Jefferson, Assistant-to Plant Manager

5W.:P._ Murphy, Vice. President and Manager.of Operations

Je T. Pearson,.Vice President of. Administration / Finance and Treasury

.

JJ.fP. Pelletier, Plant Manager

Yankee ~ Atomic Electric. Company-

A.'C.IKadak,' Vermont Yankee Project Manager 7

.

A. M.-Shep,ard, Director;of Quality Assurance

~

'

~ 2.'

3NRC Attendees

.

Sc D2.Ebneter,. Director, Division of Reactor Safety.

~

-J.'H &Joyner,~ Chief, Nuclear Materials Safety and Safeguard Branch

-

W. F.:Kane, Deputy Director, Division of. Reactor Projects

_

,

G. W..Meyer, ProjectLEngineer, Reactor Projects-Section 3A

. <

,

T.-'E. Murley, Regional: Administrator

e

-

- -

.W.lJ. Raymond, Senior Resident Inspector-

'

, V.1 L Rooney, Licen~ sing Project Manager, NRR

'R. W.c Starostecki, Director, Division of Reactor Projects

,

.

L L. EC Tripp,: Chief, Reactor Projects Section 3A

~

'

E.' C.:Wenzinger, Chief, Projects Branch No. 3-

u

'

/ ~ r

pg

"L

.

-

f

-

.

___

. .