Text
,
.-
b
'.
.
MAY 2 91985
s
In Reply Refer To:
Docket: 50-298/85-14
Nebraska Public Power Dist'rict
ATTN:
J.
M.~ Pilant, Manager, Technical
Staff-Nuclear Power Group
'P. O. Box 499
Columbus, Nebraska 68601
-Gentlemen:
This: refers to the inspection conducted by Mr. R. E. Baer of this office during
the period April 1-5,.1985, of activities authorized by NRC Operating
' License DPR-46 for Cooper Nuclear Station, and to the discussion of our
findings with Mr. D. A. Whitman and other members of your staff at the
conclusion of the inspection, and a subsequent telephone conversation with
Mr. J. - Sayer on May 9,1985, regarding the open items discussed in paragraph 3
of the enclosed report.
Areas examined during the inspection included radiation protection activities
-and allegations regarding personnel dosimetry records. Within these areas, the
~ inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector. These
findings are documented in'the enclosed inspection report.
During this inspection, it was found that certain of-your activities were in
. violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of-the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on'the specifics contained in the
Notice of Violation enclosed.with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings. 'The status of these items is identified in
paragraphs 2 and 7 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980,'PL 96-511.
RIV:FRPS
FRPS
E
D:D
E0
PS
RPB1
~
%EBaer/vls
@Murray
rey /\\)/85 blh/85 l/ff85
C'/9/85
$/15/85
all
R
ng rt TFWesterman
JPJ u on EHJohnson
y /
85
) / /85 g
8506030375 850529
ADOCK 050 g g
,
i
G
!
I
c
-%
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Crigina! Signed By
e H. Johnson
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix _AL- Notice of Violation
. 2 .' Appendix B - NRC Inspection Report
50-298/85-14
.
cc w/ enclosures:
'
'
Paul V. Thomason, Division Manager
of. Nuclear Operations
Cooper Nuclear _ Station
/
P. O. Box 98
Brownville,_ Nebraska 68321
Kansas-State Dept. Health
Nebraska State Dept. Health
- bec to DMB (IE06)
bec distrib. by RIV:
- RPB1
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB1/A)
- D. Weiss, LFMB (AR-2015)
- EP&RPB
- R. Baer
- MIS System
- B. Murray
- RIV File.
R. Bangart
- RSTS Operator
T. F. Westerman (2 copies)
- w/766
_