ML20128N595

From kanterella
Jump to navigation Jump to search
Forwards Updated TS Section 3.5.A, Core Spray & LPCI Bases to Reflect Latest LOCA Analysis Performed Using GE SAFER/GESTR-LOCA Methodology.Results of Analysis Incorporated Into FSAR Section 6.5
Date released: 05/21/2020 Download: ML20128N595


Proposed TS Section 3.5.A, Core Spray & LPCI Sys Bases, Reflecting Latest LOCA Analysis Performed by GE
ML20128N596
Person / Time
Site: Pilgrim
Issue date: 02/11/1993
From:
BOSTON EDISON CO.
To:
References
Download: ML20128N596 (2)
Forwards Updated TS Section 3.5.A, Core Spray & LPCI Bases to Reflect Latest LOCA Analysis Performed Using GE SAFER/GESTR-LOCA Methodology.Results of Analysis Incorporated Into FSAR Section 6.5
ML20128N592
Person / Time
Site: Pilgrim
Issue date: 02/11/1993
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20128N592 (2)