ML20128N111

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-443/85-03.Corrective Actions:Batteries Identified W/ Nameplate Attached to Rack in Each Battery Room & on Each Door to Battery Room.Tagging Completed by 851101
ML20128N111
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/23/1985
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
SBN-805, NUDOCS 8506030175
Download: ML20128N111 (3)


Text

-

q

. i

+ -

SEABROOK STATION Enginssring Offics

' e) (.- - - - - .

l J

'~

\J l Putse service of New HampeNro NEW HAMPSHIRE YANKEE DIVISION May 23, 1985 SBN- 805 T.F. B4.2.7 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Attention: Mr. Stewart D. Ebneter, Director Division of Reactor Safety

References:

(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) USNRC Letter dated April 25, 1985, " Inspection Report No. 50-443/85-03", S.D. Ebneter to R.J. Harrison

Subject:

Response to li.spection Report No. 50-443/85-03

Dear Sir:

Our response to the violation reported in the subject inspection is provided in Attachment A, included herewith. The corrective action completion dates are also provided therein.

Very truly ours, t* /

John DeVincentis, Director Engineering and Licensing Attachment cc: Atomic Safety and Licensing Board Service List G

$600175850523 DOCM 05000443 PDR

\

Seabrook Station Construction Field Office . P.O. Box 700 Seabrook, NH 03874 @D

9 William S. Jordan, III Donald E. Chick Diane Curran Town Manager Harmon, uaiss & Jordan Town of Exeter 20001 S. Stree t, N.W. 10 Front Street

. Suite 430 Exeter, NH 03833 Washington, D.C. 20009 Brentwood Board of Selectmen Robert G. Perlis RED Dalton Road Office of the Executive Legal Director Brentwood, NH '03833 U.S. Nuclear Regulatory Commission Washington, DC 20555 Richard E. Sullivan, Mayor City Hall Robert A. Backus, Esquire Newburyport, MA 01950 116 Lowell Street P.O. Box 516- Calvin A. Canney Manchester, NH 03105 City Manager City Hall Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Augusta, ME- 04333 Dana Bisbee, Esquire Mr. John B. Tanzer Assistant Attorney General Designated Representative of Office of the Attorney General

! the Town of Hampton 208 State House Annex 5 Morningside Drive Concord, NH 03301 Hampton, NH 03842 Anne Verge, Chairperson Roberta C. Pevear Board of Selectmen Designated Representative of Town Hall

. the Town of Hampton Falls South Hampton, NH 03827 4 Drinkwater Road -

Hampton Falls, NH 03844 Patrick J. McKeon Selectmen's Office Mrs. Sandra Gavutis 10 Central Road Designated Representative of Rye, NH 03870 the Town of Kensington RFD 1 Carole F. Kagan, Esquire East Kingston, NH 03827 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Jo Ann Shotwell, Esquire Washington, DC 20555 Assistant Attorney General Environmental Protection Bureau Mr. Angi Machiros Department of the Attorney General Chairman of the Board of Selectmen One Ashburton Place, 19th Floor Town of Newbury Boston, MA 02108 Newbury, MA 01950 Town Manager's Office Senator Gordon J. Humphrey U.S. Senate Town Hall - Friend Street Washington, DC 20510 Amesbury, MA 01913 (ATTN Tom Burack)

, Senator Gordon J. Humphrey

- Diana P. Randall 1 Pillsbury Street 70 Co111ns Street Concord, NH 03301 Seabrook, NH 03874 (ATTN: Herb Boynton)

e--

, P ga 1 of 3 ATTACHMENT A NRC Notice of Violation 443/85-03-01 10CFR50, Appendix B, Criterion VIII states, in part, that " Measures shall be established for the identification and control of materials, parts, and components. . . throughout. . . installation and use of the item."

The Seabrook Station FSAR, Section 8.1.5.2, states that electrical equipment will conform to IEEE standards 279 and 308. These standards require that equipment be identified to assure proper installation, operation, surveillance and maintenance.

Electrical Procedure FEP 519, Revision 0, Interim Procedure Change (IPC) 4, page 7, paragraph 5.2.1 states, " Equipment shall be checked for its correct item number and/or number with correct nameplate."

Contrary to the above, on February 12, 1985, the following safety electric equipment did not have identifying nameplates attached as required by the procedure:

- Reactor Trip Switchgear 1-CP-CP-lli Reactor Trip Logic Panel Trian B (front) 1-MM-CP-13

- Class 1E 125 volt Batteries (four)

This is a Severity Level V Violation (Supplementa II).

Response

In order to evaluate this violation and to determine what corrective action, if any, should be taken we have subdivided this into two categories -

Westinghouse (W) supplied equipment and United Engineers and Constructors, (UE&C) supplied equipment. This categorization is necessary because Westinghouse supplied equipment is not furnished with a namplate specifying the UE&C equipment tag number.

A. United Engineers & Constructors Supplied Equipment:

The Class IE 125 volt batteries (4) are a UE&C supplied item. Th e f ailure to have the baLLeries identified with a permanent identification nameplate is a nonconforming condition. The batteries will be identified by a nameplate aLLached to one of the racks in each baLLery room as well as on each door entering into a baLLery room (4 total). Our investigation of this nonconfirmity concluded that this was an isolated incident for UE6C equipment.

Corrective Action A Nonconformance Report, Number 82/544A, has been issued addressing this nonconformity. The required Lagging will be completed by November 1,1985.

P:gs 2 cf 3 ATTACHMENT A B. Westinghouse (W) Supplied Equipment:

After reviewing procedures and specifications governing the identification tagging of }[ supplied equipment, we do not believe that we have violated 10CFR50 Appendix B, Criterion VIII; IEEE Standards 279 and 308 or Electrical Procedure FEP-519. The following provides in more detail the justification why our procedures are adequate and that there was effective implementation of these procedures.

Westinghouse is not required, by contract, to furnish NSSS equipement with the UE&C equipment tag number identified on the equipment.

Accordingly, these items are tagged upon receipt inspection (Reference Procedure QCP 7-2) in accordance with UE&C's specification No. 9763.006-5-11. The tagging method used, at receipt inspection, for NSSS electrical equipment (e.g. switchgear, panels) is attachment of a stainless steel nameplate to the equipment by means of a stainless steel wire. It should be noted that until the tagging operation has been completed a given item is held in receipt inspection.

Prior to turning over NSSS Electrical Equipment to the Startup Test Department (STD) a permanent plant nameplate (e.g. phenolic nameplate) is attached to the equipment in accordance with electrical procedure FEP-519. This permanent plant nameplate is provided mainly to make NSSS electrical equipment consistent with the tagging of UE&C supplied electrical equipment.

To summarize the above, the stainless steel nameplate affixed to the NSSS electrical equipment at receipt inspection is the primary means of correctly identifying the equipment until the permanent plant nameplate is attached to the equipment. Since the stainless steel nameplate is then redundant it's attachment to the equipment is no longer controlled. Therefore, by means of the above we have established controls to identify NSSS electrical equipment "... throughout

... installation and use of the item".

In regards to the implementation of the above described procedure for the }[ electrical equipment cited in your notice of violation, including a review of the associated Quality Control documentation, we offer the f ollowing:

1. Reactor Trip Switchgear 1-CP-CP-lli
n. Receiving inspection report was correct indicating that the Westinghouse identification was satisfactory.
b. The UE&C identification number on the stainless steel nameplate was attached to the switchgear. Furthermore, we verified, after the NRC inspections that the stainless nameplate was still attached.
c. The switchgear has not been turned over to Startup and review of the Procedure FEP-519 checklist showed that the identification nameplate attribute had not been signed off.

p: ,:- 3,-

s. (g *

- , 1

, - Pegs 3 of 3 ATTACHMENT A

-2.- Reactor Trip Logic Panel Train B (front) 1-MM-CP-13

.a. Receiving inspection report was correct indicating that the Westinghouse-identification was-satisfactory.

'b.' The'UE&C identification number on the stainless steel-nameplate was attached to the switchgear. Furthermore, we verified, after the NRC inspections that the stainless nameplate was still attached.

oc. - The logic panel has been turned over to STD with the permanent plant nameplate affixed .to the panel.

.d. The permanent plant nameplate is located on the rear of the panel.which is not considered good practice and is not consistent with nameplates affixed to other electrical equipment. Therefore, another permanent plant nameplate shall be affixed to the front of this panel.

Locating the permanent plant nameplate on the rear of this panel appears to be an isolated incident based upon review of records and inspection of other panels installed in that area.

Corrective Action

1. Reactor Trip Switchgear 1-CP-CP-111 -

A -Yankee Atomic Electric Co. Deviation Notice #076 was issued prior to the completion of our evaluation.- Howeve r,' ' t he conclusion of our evaluation was that no corrective action was in fact required.

2. Reactor Logic Panel Train B 1-MM-CP-13 Pursuant to STD Work Request No. SSPS0093 a permanent plant..

nameplate was attached to the front of the panel-on or about' March 4, 1985.

O m

N

_