ML20128M539
| ML20128M539 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/16/1985 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| (RDC-130(85)), NUDOCS 8505310694 | |
| Download: ML20128M539 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
6 rw GL
/
THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216; 622-9800 - lLLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESlOENT May 16, 1985 NUCLEAR PY-CEI/OIE-0051 LQ Mr. James G. Keppler Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos.
50-440; 50441 Fire Protection Safe Shutdown Analysis [RDC 130(85)]
Dear Mr. Keppler:
As stated in our interim report on this subject dated March 22, 1985, we are submitting this letter to advise you of our progress.
The Safe Shutdown Reanalysis is complete and corrective measures are in process.
We will file our next report following the initiation of all required design changes.
Please call if there are any questions.
Sincerely, AM Murr r R.
Edelman Vice President Nuclear Group MRE:sab B505310694 850516 ADOCK050g40 j
PDR S
Y 3 0 boo
'fo 1637
l
~
g.
MR. JAMES G. KEPPLER PY-CEI/OIE-0051 LQ MAY 16, 1985 PAGE 2
-cc:
Mr. J. A. Grobe USNRC, Site Office Mr. D. E, Keating USNRC, Site Office Director Office of Inspection and Enforcement U.S.
Nuclear-Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission o
c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Seite 1500 Atlanta, Georgia 30339
-.