Text
w
,
~6$
. ~$ f
,
i
October 7, 1996
Mr. E. Watzl, Vice President
Nuclear Generation
Northern States Power Company
414 Nicollet Mall
'
Minneapolis, MN 55401
-
!
SUBJECT:
NRC INSPECTION REPORT NO. 50-263/96007(DRP)
'
Dear Mr. Watz1:
'
On August 28, 1996, the NRC completed an inspection at your Monticello reactor
facility. The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection period, your conduct of
activities at the Monticello facility was generally characterized by safety-
conscious operations, sound maintenance practices, and acceptable engineering
performance.
1
On August 16, 1996, Mr. M. J. Jordan of my staff discussed with Mr. W. Hill
your operaM11ty evaluation on the reactor water cleanup system.
This
discussior, was prompted by your discovery of conditions outside of your
Updated F Inal Safety Analysis Report. We expressed a concern with your
response of allowing operation of the reactor water cleanup system while less
than 90 percent power, outside your Updated Final Safety Analysis Report,
,
instead of isolating the system. Mr. Hill stated he would not operate the
system below 90 percent unless needed for reactor safety. Subsequent to this
conversation, an analysis was done using water chemistry nuclides which
j
removed restrictions on power operation.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
i
this letter and its enclosures will be placed in the NRC Public Document Room.
Sincerely,
Original signed by John A. Grobe
James L. Caldwell, Acting Director
150048-
Division of Reactor Projects
i
l
Docket No. 50-263
License No. DPR-22
,
Enclosures:
Inspection Report
9610160096 961007
ADOCK 05000263
\\ \\
G
l
l
f
-
4
.-
, , - + , ,
,
l
V. ~
E. Watzl
-2-
Distribution:
cc w/ encl:
Plant Manager, Monticello
John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
State Liaison Officer, State
of Minnesota
Docket File w/ encl
DRP w/ encl
PUBLIC IE-01 w/ encl
RIII PRR w/enci
OC/LFDCB w/ encl
Project Manager, NRR w/ encl
SRI Monticello, w/ encl
Prairie Island w/ encl
A. B. Beach, w/ encl
B. L. Burgess, w/ encl
W. L. Axelson, w/ encl
CAA1 w/ encl (E-mail)
.
(See attached con urrence)
g g i.....,,.,\\INSPRPTS\\P.OWERS\\.MONT\\. MON 96007.DRP
Document: R:
ini.
- . ...... i ii
c . c.,,. . . .ti.ci.f
i c . c.,,.iin .ti.ci.f
i
-r -
l
l
l
pim A A
l
nitt
otti
orrier
errt
M t .,,
-
o.....
c....
....
d41;
nn
..i i..
..i i..
..i i..
"a
tv
.
- _ .
_ _
_
__
i
Mr. E. Watzl, Vice President
Nuclear Generation
Northern States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
4
SUBJECT:
NRC INSPECTION REPORT NO. 50-263/96007(DRP)
Dear Mr. Watzl:
On August 28, 1996, the NRC completed an inspection at your Monticello reactor
facility. The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection period, your conduct of
activities at the Monticello facility was generally characterized by safetr
conscious operations, sound maintenance practices, and acceptable engineering
performance.
On August 16, 1996, Mr. M. J. Jordan of my staff discussed with Mr. W. Hills
your operability evaluation on the reactor water cleanup system. This
discussion was prompted by your discovery of conditions outside of your
Updated Final Safety Analysis Report. We expressed a concern with your
response of continuing to operate the reactor water cleanup system while less
than 90 percent power instead of isolating the system.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
Sincerely,
James L. Caldwell, Acting Director
Division of Reactor Projects
Docket No. 50-263
License No. DPR-22
Enclosures:
Inspection Report No. 50-263/96007
cc w/ encl:
Plant Manager, Monticello
John W. Ferman, Fh.D.,
Nuclear Engineer, MPCA
State Liaison Officer, State
of Minnesota
(See continued distributioul
Document:
R:
g ,,
.% . .
. \\.. INS.PRPTS..\\ POWERS.\\.MO.NT\\. MON 96007.DRP
.
-
w.
..
-c-c
...
s.es
/
ie-c
........nf
i
n-
0FFICE
RIII
5
Rill m t
b
RIII
13
RIII
,n
NAME
JordanL}\\M
Cre h
Ri [
Grobe/Caldwell
DATE
09/1 /96
09b6
09/D/96
09/ /96
L
0FFICIAL RECORD COPY
-