ML20128M178
| ML20128M178 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/06/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| References | |
| NUDOCS 8507110596 | |
| Download: ML20128M178 (1) | |
Text
-
q/guded JUN061%
Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
EMERGENCY NOTIFICATION SYSTEM (ENS) - HATCH NUCLEAR POWER PLANT This letter responds to your letter of April 13, 1984, regarding the establishment of ENS extension from the control room simulator to the Emergency Operations Facility.
This issue has been discussed with the NRC Telecommunications Branch, Division of Facilities and Operations Support /ADM. The Telecommunications Branch has advised us that the addition of this line could result in degradation of the quality of the emergency notification system; therefore, this request is dis-approved.
Further discussion on this subject should be directed to the NRC Telecommunications Branch in Washington, DC.
Questions regarding this matter should be referred to the Telecommunications Branch Chief, Mr. Thomas Kellam at (202) 492-8070.
Sincerely, Virgil L. Brownlee, Chief Reactor Project Branch 2 Division of Reactor Projects cc: J. T. Beckham, Vice President and General Manager H. C. Nix, Site General Manager P. E. Fornel, Site QA Supervisor L. Gucwa, Chief Nuclear Engineer bec:
E. Reise, ELD f Si d 1, 'II:
NRC Resident Inspector Document Control Desk State of Georgia Hugh S. Jordan, Executive Secretary Georgia Public Service Commission RI
- RII, L
m iera - [
rown ne Collins
/}/85
/85 3 /85
/85
!t E 18Ek S8888at s
F PDR
.IE3 5~~
.