Confirms 850625 Telcon W/B Ferrell Re Error in SER Section 13.4.3, Independent Safety Engineering Group. Ref Should Be Made to Section 4.7 of Ansi/Ans 3.1
ML20128L937
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/03/1985
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8507110489
Download: ML20128L937 (2)


Text

y

?

'O o

Docket Nos.: 50-440 3UL 0 31985 and 50-441 Mr. Murray R. Edelman, Vice President Nuclear Operations Group The Cleveland Electric Illuminating Company l

P. O. Box 5000 Cleveland, Ohio 44101

Dear Mr. Edelman:

Subject:

Correction of Error in Section 13.4.3 of the SER for the Perry Nuclear Power Plant, Units 1 and 2 This is to confirm the Project Manager's telephone conversation with Mr. Brad Ferrell of your staff on June 25, 1985, in which we agreed that an error exists in Section 13.4.3, " Independent Safety Engineering Group" in the Perry SER.

In stipulating the requirements of ANSI /ANS 3.1 (December 1981) reference should have been made to Section 4.7 of that Standard and not Section 4.2.

Section 4.2 will be changed to Section 4.7.

Sincerely, ORIGINAL SIGNED Mt B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing cc: See next page 1

n 5T" RON:

h ocket E #

ACRS(16)

NHLFUR EJordan LPDR JPartlow NSIC BGrimes PRC System HBooher LB#1 R/F LCrocker MRushbrook OELD JStefano sfb tB,8u' i

sJStef a:kab BJYa blood 0

/85

/

/85 9507110489 850703 PDR ADOCK 05000440 E

PDR

P O

JUL 0 3 M65 Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric Units 1 and 2 Illuminating Company cc:

Jay Silberg, Esq.

Mr. Larry 0. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1800 M Street, N. W.

Illuminating Company Washington, D. C.

20006 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser, Esq.

The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U. S. Nuclear Regulatory Commission Parmly at Center Road Perry, Ohio 44081 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Donald T. Ezzone, Esq.

Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 Ms. Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, Ohio 44060 Terry J. Lodge, Esq.

618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.

Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047