ML20128L659

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-327/OL-85-01 of Exam Administered on 850520-23.Encl Proprietary Table of Exam Results Withheld (Ref 10CFR2.790(a))
ML20128L659
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 06/27/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19304B354 List:
References
NUDOCS 8507250083
Download: ML20128L659 (3)


Text

. - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

NE1 M

June 27,1985 Tennessee Valley Authority ATTN
Mr. H. G. Parris Manager of Power and Engineering 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:

SUBJECT:

SEQUOYAH EXAMINATION REPORT 50-327/0L-85-01 The NRC administered examinations on May 20-23, 1985, to employees of your company who had applied for licenses to operate the Sequoyah Nuclear Plant. At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Enclosure 2.

f Copies of the written examination questions and answer key are included in this report as Enclosure 3.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 and 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Docu-ment Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by DMVerrelli)

David M. Verre111, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosures:

1. Examination Report 50-327/0L-85-01
2. Table of Examination Results (Official Use Only-Privacy Act Information)
3. R0/SR0 Exam Questions and Answer Key

~

AM )

cc w/encls. 1 & 2: (See page 2) A4 f z /'g(f0/0 f

~

A/(k A/S/6 t I sy*1Rh P 1E %2

, s,

ts;f

Tennessee Valley Authority 2 June 27, 1985 cc w/encls. 1 & 2i

~

R.'J. Johnson, Corporate Training Manager

.P.~R.-Wallace, Plant Manager cc w/encls. 1, 2, & 3:

.C.-H. Noe, Supervisor, Operator Training bec w/encls. 1, 2, & 3:

Senior. Resident Inspector bec w/ enc 1.1:

Project Manager, NRR State of Tennessee

'bec w/encls. l'& 3:

Operator Licensing Branch, DHFS,NRR Document Control Desk RII. RII RII 3 RII g W64

. Douglas: ht BAWilson b

AFGib's O

SWeise 6/It/85 6 % 85 6/298 6/g6/85

7.

"l% , '

',f ROUTING AND TRANSMITTAL SU g

TO: (Name, oNice symbol, room number, ouMag, Agency / Post)

(/ Initials Date 1.

3.

3.

4.

S.

Action File Note and Return Approval For Clearance Per Conversation As Requested For Correction Prepare Reply Circulate For Your Infonnation See Me Comment Investigate Signature Coordination Justify

& CAY j Me '

  1. 9 f%

DO NOT use this form as a RECORD of approvals, concurrences, disposats, clearances, and similar actions Fll0M:(Name, org, symbol Agency / Post) Room No.-Bide fxr.' ? @. -

G)tLuas c.A.i/- )B7t Tf5b 6%S~ff soss-102

/ OPTIONAL FOltM 41 (Rev. 7-76)

  • GPO . 1983 0 - 381-529 (303) FPseR Ck -11.20s J