- _ _ _ _ - _ _

VERMONT YANKEE NbCLEAR POWER CORPORATION

~

(Y P.O. Box 157, Governor Hunt Road

~ - -

s sf)

)

Vernon, Vermont 05354-0157

't J.-

s/

(802) 257-7711 x '$$f

.. g, _

Febmary 10, 1993 VY-RCE-93-006 BVY 93-013 U.S. Nuclear Regulatory Commission Washington, D.C. 20:55 Attn:

Document Control Desk

Reference:

a)

License No. DPR-28 (Docket No. 50-271)

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of January 1993.

Very tmly yours, Vermont Yankee Nuclear Power Corporation d --

rgo

" James P. Pelletier Vice President, Engineering cc:

USNRC, Region I USNRC Resident Inspector, VYNPS DP 0411 Rev. 4 Page 1 of1 18 124 I

93021801Bx 930131 f,hy I

PDR ADOCK 05000271 R

PDR

/v l

___ Q

. 4 g,

q 1

.3.,-

af y:

E s

I k

<)

VERMONT YANKEE NUCLEAR' POWER STATION.

MONTIILY STATISTICAL REPORT 93-01.

t

' FOR TIIE MONTII OF JANUARY 1993 7

c-.

' DP 0411 Rev. 4 Page l 'of I s

l -

d

.: }-)

[

'95 t.

s s

I 'd.,, J h

m.

x.

OPERATING DATA REPORT DOCKET NO.50-271

.DATE-930210 COMPLETED BY G.A. WALLIN TELEPHONE '802)257-7711 OPERATING STATUS-

1. Unit Name:

Vermont Yankee

2. Reporting Period:

Janua ry.__

NOTES:

3. Licensed Thermal Power (MWt) 1593
4. Nameplate Rating (Gross MWe): EAR
5. Design Electrical Rating (Net MWe) :

514 (oc) 504 (cc) 6-Maximum Dependable Capacity (Gross MWe) :

111

7. Maximum Dependable Capacity (Net MWe):

EDA 8.

If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:

N/A 9.

Po 'er level to which-restricted, if any(Net-MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month Yr-to-Date LCumulative

11. Hours in Reporting Period

~744.00 744.00' 176808.00

12. Number Of Hours Reactor was Critical 744.00 744.00 144940.35.
13. Reactor Reserve Shutdown Hours 0.00 0.00' O.00
14. Hours Generator On-Line 744.00 744.00.

141998;64-

15. Unit Reserve Shutdown Hours 0. QQ..

0.00 0 ~. 0 0 :

16.-Gross Thermal Energy Generated (MWH)

-1184133.50 1184133.50 211255199.50

_17. Gross Electrical'Energ/ Generated 399919.00 399919.00l 70385077.00:

18. Net Electrical Energy Generated (MNH) 384517.00 304517.00 66859392'00
19. Unit Servica Factor 100~.00-100 QQ-_

79.55'

20. Unit Availability Factor 100.00 100.00 79.55'-
21. Unit Capacity Factor (Using MDC Net)

- 102.54_

102.54 74.31E

22. Unit Capacity Factor (Using DER Net)-

-100.55 100.55

~ 72.87

=23.' Unit Forced Outage Rate 0.00 0.00 5.17

24. Shutdowns scheduled over next 6 months (Type,.Date, and Duration of--

Each:

N/A

25. If sbut down at end of report period, estimated date of startup:N/A
26. Units In Test Stacus (prior to commercial operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01

' DP 0411 Rev. 4

. Page 1 of 1

' RT No. 13.F01.19F M

tr ye s__._____________,_____,____________.____,_________m_______m.

AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO. 50-271 UNIT Vermont Yankee DATE 930210 COMPLETED BY G.A. WALLIN TELEPHONE

_@D2)257-7711 MONTH

,_Qanparv DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

517 17, 3.17 2.

517 18, 517 3.

516 19.

519 4.

517 20.

517 5.

517 21.

517 6.

517 22.

517 7.

517 23, 517 8.

517 24.

517 9.

517 25.

517

)

10, 516 26.

517 11, 536 27.

517 12.

516 28.

517 13.

516 29.

517 14, 516 30.

517 15.

516 31.

516 4

16, 517 INSTRUCTIONS:

On this format, list the average daily unit power level in MWF-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 DP 0411 Rev. 4 Page 1 of 1 RT No. 13.F01,18V D

k

~

W UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JANUARY DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 930210 COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 1

2 3

4 5

No.

Date Type Duration Reason Method of License System Component Cause and Corrective (hours)

Shutting Event Code Code Action to Prevent Down Report #

Recurrence Reactor j

(None) h l

3 Method:

4 Exhibit G-Instructions 1

F: Forced 2 Reason:

S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparation of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License C-Refueling 3 - Automat ic Scram Event Report (LER) File D-Regulatory Restriction 4 - Other (Explain)

(NUREG 0161)

E-Operator Training and 5 Exhibit I - Same Source License Examination VYDPF 0411.03 F-Administrative DP 0411 Rev. 4 G-Operational Error (Explain)

Page 1 of 1 H-(Explain) -

I

.: 4 4-e,q_

DOCKET NO.S50-271

.DATE 930210--

=4' COMPLETED BY G.A. WALLIN

=;

TELEPHONE (802)257-7711_.

REPORT MONTH Januarv

SUMMARY

OF OPER/1 TING EXPERIENCES Highlighta Vermont Yankee operated-at 9.3_,31 of. rated thermal power for the month.-

Gross electrical generation was 399.919-MWHe or 99.5% design electrical

'capacity.-

Operatinct Summary The_following_is a. chronological description _'of plant operations _ including l other pertinent items of interest for the month:

At the beginning of the reporting period the_ plant was operating at:99.9%-

of rated thermal power.

There were-no items of interest to report--for this month.

k

(

.At the end of the reporting period the plant was operating at 99.9%.of-l rated thermal power.

s

'~

VYDPF'0411.04 DP.0411 Rev. 4

Page.1D of L 1 --

RT No. 13.F01.18X'

~.-

..