ML20128K075

From kanterella
Jump to navigation Jump to search
Forwards Gibbs & Hill 840611 Design Procedure DP-1, Seismic Category I Electrical Cable Tray Supports,Comanche Peak Steam Electric Station Units 1 & 2, Per Response to Cygna Phase 1 & 2 Independent Assessment Program
ML20128K075
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/11/1984
From: Williams N
CYGNA ENERGY SERVICES
To: Burwell S
Office of Nuclear Reactor Regulation
Shared Package
ML20128K080 List:
References
83090.018, NUDOCS 8507100473
Download: ML20128K075 (3)


Text

-'yo s

gwess 101 Cahfornia Street, Suite 1000, San Francisco. CA 94111-5894 415 337 5600 September 11, 1984 83090.018 Mr. S. Burwell Licensing Project Manager U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Subject : Transmittal of Supplemental Information Comanche Peak Steam Electric Station Independent Assessment Program - Phases 1 and 2 Texas Utilities Generating Company Job No. 83090

Dear Mr. Burwell:

Enclosed please find a copy of Gibbs & Hill letter GTN-69106 and attachment.

This is the Gibbs & Hill cable tray support design procedure which was prepared in response to a recommendation in the Cygna Phase 1 and 2 Final Report TR-83090-01.

I have briefly reviewed it but have not commented on it.

If you have any questions, feel free to call at your convenience.

Very truly yours,

%W.l&22d%

g.:. ;

N. H. Williams F'

Project Manager dm Enclosure cc: Mr. S. Treby w/ attachment (USNRC)

Ms. J. Ellis w/ attachment (CASE)

Mr. J. B. George w/o attachment (TUGCO)

Mr. D. Wade w/o attachment (TUGCO)

Mr. R. Ballard w/o attachment (TUGC0)

Mr. D. Pigott w/ attachment (0 rick, Herrington & Sutcliff) 8507100473 840911 PDR ADOCK 05000445 A

PDR San Francisco Doston San Diego Chicago Richland k

/

_ ; >J

REBallard/TDHawkins/369, ELBezkor/AMKenkre, Q uang ] cChang, OUTGOING i

N0HDSEP10 gy m,,

June 12, 1984 9

GTN-69106 Texas Utilities Generating Company Post Office Box 1002 Glen Rose. Texas 76043 Attention:

Mr. J. B. George, Vice President / Project Gen. Mgr.

Gentlemen:

TEXAS UTILITIES GENERATING COMPANY COMANCHE PEAK STEAM ELECTRIC STATION G&H PROJECT NO. 2323 DESIGN PROCEDURE: DP-1 SEISMIC CATEGORY I ELECTRICAL CABLE TRAY SUPPORTS WOS-046/DOW-3465 REF:

USNRC DOCKET NO. 50-445, 2/6/84 In accordance with the above reference, we are herewith issuing the Design Procedure "DP-l S'eismic Category I Electrical Cable Tray supports" for your use.

An advanced copy is being hand f'..

carried to site by R.E. Ballard.

Site is to provide distribution

~

as required.

l Very truly yours, GIB

& H LL, Inc.

D

(

j REBa/ELB PTilagw Robert E. Ballard, Jr.

1 Letter + Attachment Project Manager i

cca ARMS (B&R Site) OL M.R. McBay (TUSI Site) IL, lA M. Deem (TUSI Site) IL, IA P.M. Milam/F. Black (TUSI/NY) IL overo

.... I..$......

e.

____g_=

PROCEDURE REVIEtt - RECORD FORM

)

Texas 9t!!! ties Generating te. _

Comanche _Feak SES

_3 h3 paesagt e a a ses so.

suset Design Procedure, Seismic Category I Electrical Cable Tray Supports DP-1 June 11, 198 tit 68 me sats R v. O June 11, 1984

-~

su sesgotaItsessee e.,g a

-asvision sata i

DEPARTutHT Ifaaet getiflALS DATE Structural pageangs av 3.T. Huann N

~ caigan atewG Dilti'L'ut 8 " '" I 8 "

fg' -

6/fgg/.

~

7 E.L. n xxor see smsm/swegar. Rosa.-

~

aCCEPf8sDe hl? 19K'

//

I Structural /SA C0=Cuansact E.J. Bond

..... 1 r.... c i... a Electrical C0=Cumatest P.N. Lalaji

__ (

.....a,..........

C0=Cunesett Sv'*.af f*6 DisctPhlet -

~

~

Quality Assurance

<0=Cuans=ct s.czarnogorsk_i _ _

1 1

M,/M.d Proj t Department Acceptance: R.E. Ballard, Jr.

D-b Project Manaaer

[

--__-,_

  • I.- - * " $-

_,,,,,,, _ _ _