Responds to 960328 Petition Submitted on Behalf of Bl Bennett,Per 10CFR2.206.Any Further Action on Issues Raised in Petition Denied.Directors Decision DD-96-13,insp Rept 50-302/96-02 W/Safeguards & Notice of Violation Encl
ML20128H353
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/07/1996
From: Miraglia F
NRC (Affiliation Not Assigned)
To: Putney L
AFFILIATION NOT ASSIGNED
Shared Package
ML20128H356 List:
References
CON-#197-17969 2.206, DD-96-13, NUDOCS 9610090314
Download: ML20128H353 (3)


See also: IR 05000302/1996002

Text

.

.

October 7, 1996

Louis D. Putney, Esq.

4805 South Himes Avenue

Tampa, Florida 33611-2616

Dear Mr. Putney:

I am responding to your Petition of March 28, 1996, that you submitted to the

U.S. Nuclear Regulatory Commission (NRC) on behalf of Barry L. Bennett (the

Petitioner) pursuant to Section 2.206 of Title 10 of the Code p_f Federal

Reaulationi (10 CFR 2.206).

In the Petition, you alleged security

deficiencies at Crystal River Nuclear Generating Plant, Unit 3 (CR3).

You

requested the NRC to investigate the Petitioner's concerns and, upon a

determination that his concerns are valid, to institute a proceeding to

suspend or revoke the operating license of CR3 pursuant to 10 CFR 2.202 until

such time as these concerns are addressed.

We acknowledged receipt of your

Petition in a letter dated April 24, 1996, and informed you that as provided

by 10 CFR 2.206, action will be taken on your request within a reasonable

time.

The NRC staff has completed its review of the issues and has reached

final conclusions, which are discussed in the enclosed Director's Decision.

Because the inspection report referenced in the Director's Decision contains

Safeguards Information, only the letter, Notice of Violation anc. the

inspection report summary are enclosed.

For reasons discussed in the Director's Decision, the staff concludes that

operation of the CR3 facility does not endanger public health and safety.

Therefore, any further action on the issues you have raised in your Petition

is denied.

As required by 10 CFR 2.206(c), a copy of this Director's Decision will be

filed with the Secretary of the Commission for the Commission's review.

I

have also enclosed a copy of the notice that is being filed with the Office of

the Federal Register for publication.

Sincerely,

OriginaT MgnoE &

WILLIAK T. RUSSELL

Frank J. Miraglia, Acting Director

Office of Nuclear Reactor Regulation

Enclosures:

1. Final Director's Decision (DD-96-13)

2. Federal Reaister Notice

3. Inspection Report No. 50-302/96-02

(Letter, Notice of Violation and Summary)

cc w/ enclosures:

See next page

l

I'

DOCUMENT NAME:

G:\\ CRYSTAL \\2206.CR3

stE PnEvious concunacNCE

)f'

To ,eceive a copy of ins document, Indicate in the box:

"C" = Copy without attachment / enclosure

'E" = Copy with attachment / enclosure

  • N" = No copy

OFFICE

PDil-3/LA

l

PDil-3/PM

_

l

PDil-3/D

.}

l (f

TECH ED

l

OGC

NAME

BClayton %

LRaghavan W

FHebdon

N

BCalure *

MDoanne *

i

DATE

10/ \\ /96

10/ $ /96

10/ ? /J6

08/09/96

09/26/96

0FFICE

DRPE:D

l

ADP

gpgl

NRR R JM

l

NRR:PSGB

l

Rll

,

I T,

FMirpgtiaM4

LCunningham *

%lPM .L WM I L L b)

NAME

SVarga *

RZ imerman*

s

DATE

09/27/96

9/27/96

a p/N%

10/ (/)/96 V

-

'

3 ^ixxG 8/21/96

06/ /96

0F FICI AL f(ECORD COPY

090065

g

9610090314 961007

PDR

ADOCK 05000302

C

PDR

-

.

-

_

.

.

Florida Power Corporation

CRYSTAL RIVER UNIT NO. 3

l

GENERATING PLANT

l

cc:

Mr. Rodney E. Gaddy

Senior Resident Inspector

j

Corporate Counsel

Crystal River Unit 3

Florida Power Corporation

U.S. Nuclear Regulatory Commission

MAC-ASA

6745 N. Tallahassee Road

P.O. Box 14042

Crystal River, Florida 34428

St. Petersburg, Florida 33733

i

Regional Administrator, Region II

,

Mr. Bruce J. Hicklc. Director

U.S. Nuclear Regulatory Commission

Nuclear Plant Operations (NA2C)

101 Marietta Street NW., Suite 2900

Florida Power Corporation

Atlanta, Georgia 30323

Crystal River Energy Complex

15760 W. Power Line Street

Mr. Gary Boldt

Crystal River, Florida 34428.-6708

Vice President - Nuclear Production

(SA2C)

Mr. Robert B. Borsum

Florida Power Corporation

B&W Nuclear Technologies

Crystal River Energy Complex

1700 Rockville Pike, Suite 525

15760 W. Power Line Street

Rockville, Maryland 20852

Crystal River, Florida 34428-6708

Mr. Bill Passetti

Mr. Percy M. Beard, Jr.

Office of Radiation Control

Senior Vice President,

'

Department of Health and

Nuclear Operations

Rehabilitative Services

Florida Power Corporation

1317 Winewood Blvd.

ATTN: Manager, Nuclear Licensing

Tallahassee, Florida 32399-0700

Crystal River Energy Complex (SA2A)

i

15760 W. Power Line Street

Attorney General

Crystal River, Florida 34428-6708

1

Department of Legal Affairs

The Capitol

Mr. Kerry Landis

Tallahassee, Florida 32304

U.S. Nuclear Regulatory Commission

101 Marietta Street, N.W. Suite 2900

Mr. Joe Myers, Director

Atlanta, Georgia 30323-0199

Division of Emergency Preparedness

'

Department of Community Affairs

2740 Centerview Drive

Tallahassee, Florida 32399-2100

Chairman

Board of County Commissioners

Citrus County

110 North Apopka Avenue

Iverness, Florida 34450-4245

Mr. Larry C. Kelley, Director

Nuclear Operations Site Support

(SA2A)

Florida Power Corporation

Crystal River Energy Complex

15760 W. Power Line Street

Crystal River, Florida 34428-6708

l

l

--

.

.

DISTRIBUTION - DIRECTOR'S DECISION (2.206)

Docket File (50-302)

PUBLIC

EDO #96209

ED0 Reading

Crystal River Reading

PDII-3 GT File

J. Taylor

J. Milhoan (0-17 G21)

J. Blaha (0-17 G21)

W. Miraglia/A. Thadani

R. Zimmerman

J. Lieberman, (0-7H5)

ADT (0-12 G18)

T. Martin, (0-11 H21)

S. Varga

J. Zwolinski

F. Hebdon

L. Raghavan

B. Clayton

C. Thomas (0-13 E16)

L. Cunningham

OGC

OPA

OCA

NRR Mail Room (EDO #96209)

C.' Norsworthy

J. Goldberg, 0GC

ASLBP

Director, OCAA

ACRS

S. Ebneter, RII

J. Johnson, Acting, RII

V. Yanez

C. Cater

E-Mail Distribution

[ PET _BBS)

\\

.

.

.

i

l

1

,

,

ENCLOBURE 1

FINAL DIRECTOR'S DECISION

!

l

DD-96-13