ML20128G862

From kanterella
Jump to navigation Jump to search
Advises That Reactor Operator & Senior Reactor Operator Written & Oral Exams Scheduled for Wks of 850916 & 1014.Ref Matl Listed in Encl Requested by 850716.License Applications Required 60 Days Prior to Exam
ML20128G862
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/02/1985
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8507090341
Download: ML20128G862 (5)


Text

. .

s JUL 2 1985 Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690

Dear Mr. Reed:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. A. Snow, Byron Training and Mr. T. Burdick, Region III, arrangements were made for the administration of examinations at the Byron Station.

The written and oral examinations are scheduled for the week of September 16 and October 14, 1985.

In order for us to meet this schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1 " Reference Material Requirements for Operator / Senior Operator Licensing Examinations" by July 16, 1985. Any delay in receiving this material will result in a delay in administering the examinations. Our examinations are scheduled far in advance with considerable planning to best utilize our limited examiner manpower and to meet the examination dates requested by the various facilities. Therefore, missing the July 16, 1985 deadline, even by a few days, will likely result in a long delay since it may not be possible to reschedule examinations at other facilities. Mr. A. Snow has been advised of our reference material requirements, the number of reference material sets that are required, and the examiners' names and addresses where each set is to be mailed.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.

Enclosure 2, " Administration of Operator / Senior Operator Licensing Written Examinations," describes our requirements for conducting these examinations.

Mr. A. Snow has also been informed of these requirements.

All operator and senior license applications should normally be submitted at least 60 days prior to the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate. eligibility has been determined. If the applications are not received at least 30 days prior to the examination dates it is likely that a postponement will be necessary.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires June 30, 1986.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.

8507090341 850702

( f){

PDR ADOCK 050 4 g

Commonwealth Edison Company 2 Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact J. I. McMillen at 312-790-5559.

Sincerely, ORIGINALSIGNEDByL.A.REYES Luis A. Reyes, Chief Operations Branch

Enclosures:

1. Reference Naterial Requirements for Operator / Senior Operator Licensing Examination
2. Administration of Operator Licensing Written Examinations cc w/ enclosure:

D. L. Farrar, Director of Nuclear Licensing V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunton, Attorney General's Office, Environmental Control Division D. W. Cassel , Jr. , Esq.

Diane Chavez, DAARE/ SAFE W. Paton, ELD L. Olshan, NRR LPM H. S. Taylor, Quality Assurance Division E. Chan, ELD J. Stevens, NRR T. Higgins, Plant Training Mgr.

cc w/o enclosures:

L. Olshan, Project Manager, NRR B. Boger, Branch Chief, OLB RILI RI

/ E B ick/lc en- ' ye 7/1/85 / gJi 4/

ENCLOSURE 1 Reference Material Requirements for Operator / Senior Operator Licensing Examinations Note: Required Material is indicated by an "X" opposite the item.

X 1. Procedure Index (alphabetical by subject)

X 2. All administrative Procedures (as applicable to reactor operation or safety X 3. All Integrated Plant Procedures (Normal or General Operating Procedures)

X 4. Emergency Procedures (Emergency Instructions, Abnormal or Special Procedures)

, X 5. Standing Orders (Important orders which are safety related and may supersede the regular procedures)

X 6. Fuel Handling and Core Loading Procedures, (Initial Core Loading Procedure, when appropriate)

X 7. Annunciator Procedures (alarm procedures, including set points)

X 8. Radiation Protection Manual (Radiation Control Manual or Procedures)

X 9. Emergency Plan Implementing Procedures X 10. Technical Specifications X 11. Lesson Plans (Training Manuals, Plant Orientation Manual, System Descriptions,ReactorTheory, Thermodynamics,etc.)

X 12. System Operating Procedures X 13. Piping and Instrumentation Diagrams, electrical single line diagrams, or flow diagrams X 14. Technical Data Book, and/or plant curve information as used by operators X 15. Questions and Answers that Licensee has prepared (Voluntary by Licensee)

-~

X 16. Malfunction and Initial Condition Material for Simulator (if applicable)

X 17. Operator Error Experiences

All of the above reference material should be approved, final issues, and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable except for cold license examinations. All procedures and reference material should be bound or in the form as used by the control room operators, with appropriate indexes or tables of contents so that they can be used efficiently.

If a cold-license plant has not finalized some of the material, the chief examiner is responsible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. ,

J 4

J

ENCLOSURE 2 Administration of Reactor /Sanior Reactor Operator Licensing Written Examinations Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.

2. Minimum spacing is required to ensure exam integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3 foot spacing between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suitable arrangements are to be made by the facility if the candidates are to have lunch, coffee, etc. These arrangements shall comply with Item 1 above. These arrangements will be reviewed by the examiner and/or proctor.
4. The facility may arrange to have a maximum of one facility staff member per section per examination available to review the examination questions and answer key. This review will only begin after all of the candidates have completed the examination and all examination materials and note have been turned in to the examiner. The review will normally be limited to a maximum of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (elapsed time). After the review, all copies of the examinations and answer keys will be collected by the examiner.
5. The licensee will provide pads of 8-1/2 x 11" lined paper in unopened packages for each candidate's use in completing the examination. The examiner will distribute these pads to the candidates. All reference material needed to complete the examination will be furnished by the examiner. Candidates can bring pens, pencils, calculators or slide rules into the examination room and no other equipment or reference material is allowed.
6. Only black ink or dark pencils should be used for writing answers to questions.

i

___