ML20128G566
| ML20128G566 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/08/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Yelverton J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20128G569 | List: |
| References | |
| NUDOCS 9302160046 | |
| Download: ML20128G566 (5) | |
See also: IR 05000313/1992014
Text
- _ _ , . .
.
.. ..
. .
.
.
.
- --
'
/ps asog
.
uNiTEo ST ATES
Jg
NUCLEAR REGULATORY COMMISSION
I
,_
E
E
RE m NIV
'
-
611 RY AN Pt.AZA DRIVE, SulTE 400
,8
AR UNGTON, T E XAS 760118064
- * * "
FEB - 81993
Docket 50-313
50-368
License DPR-51
NPF-6
Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President
Operations, Arkansas Nuclear One
Route 3, Box 137G
Russellville, Arkansas 72801
SUBJECT:
NRC INSPECTION REPORT 50-313/92-14; 50-368/92-14
This refers to the inspection conducted by Ms. L. J. Smith, and_the inspectors
identified in the attached report, of this office and the Office of Nuclear
Reactor Regulation on December 6, 1992, through January 23, 1993.
The
inspection included a review of activities authorized for your Arkansas
Nuclear One, Units 1 and 2, facility.
At the conclusion.of the inspection,
the findings were discussed with those members of your staff identified ir. the
enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selactive examination of procedures
and representative records, interviews with personnel, and observations of the
activities in progress.
The results of this inspection are documented on
page 3 in the enclosed report.
it is our understanding that, during the exit meeting conducted on
January 22,1993, -Mr. R. Espolt, Acting Plant Manager, Unit 2, committed to
develop an appropriate method for periodically confirming the functionality of
the heat tape circuitry used to protect meteorological tower instrumentation
from freezing.
If your understanding of this commitment differs from ours,
please contact me promptly,
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and its enclosure will be placed in the NRC's Public Document-
Room.
9302160046 930208
'PDR
ADOCK 05000313
O
l
1
.k
--
. . -
.
._
_
.
.
i
.
k
-
,
LEntergy' Operations,~Inc-
-2-
'
.
'
Should you have any questions concerning this inspection, .wa will be pleased
to discuss them with.you.
Sincerely,
y;)2C /m
]
L-
,-
7
Y,/Lw
. Bill Beach, Dire to
/
/ '
Division of Reactor roje s/
Enclosure:
Appendix - NRC Inspection Report
50-313/92-14; 50-368/92-14 w/ attachment
,
cc w/ enclosure:
'
Entergy Operations, Inc.
ATTN: Donald C. Hintz, President &
Chief Operating Officer
-P.O. Box 31995
Jackson, Mississippi 39286
Entergy Operations,-Inc.
ATTN: John R. McGaha, Vice President
Operations. Support
P.O. Box 31995-
Jacks 6n,_ Mississippi 39286
-Wise, Carter, Child & Caraway-
ATTN: -Robert B. McGehee, Fsq.
.P.O. Box 651
-Jackson,. Mississippi 39205
Entergy Operations,.Inc.
ATTN: James J. Fisicaro
Director, Licensing
Route 3,-: Box 137G
- Russellville, Arkansas- 72801-
Honorable Joe [W. Phillips
,
= County Judge of Pope County
-Pope County Courthouse-
Russellville, Arkansas- 72801
Winston & Strawn
ATTN:
Nicholas.. S. Reynolds, - Esq.
.1400 L Street,;N.W.
Washington, D.C.
20005-3502-
._
>
.-
+
y
wwt
. - -
-
-
-
.
, ,
. . .
~
c
.
54
'Entergy Operations,-Inc-
-3-
. Arkansas Department _of Health
>
? ATTN: 'Ms., Greta Dicus, Director
_
Division of Radiation control-and
Emergency Management-
4815 West Markham Street
Little Rock, Arkansas 72201-3867
B&W Nuclear _ Technologies
-
ATTN:
Robert B.-Borsum
Licensing Representative
.
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
.
Admiral Kinnaird R. McKee, USN (Ret)
,
-214 South Morris Street
.
Oxford, Maryland 21654
-
>
ABB Combustion Engineering
Nuclear Power
ATTN:
Charles B. Brinkman
Manager, Washington-
-Nuclear Operations
<
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
.
3
.i
Y
,
-
__
-
. .
.
.
.
.. .
.
.
.
.
. - . .
-
..
- .-
'
..
Entergy Operations, Inc
-4-
bec'to DMB (IE01)
,
bec distrib. by RIV:
.J. L. Milhoan
Resident Inspector
Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
SectionChief'(DRP\\TSS)
Project Engineer (DRP/A)
.
Y# t#'ish
9
RIV:EA:DRP/A RI:DRP/A
SRiiDR/A PE:DRP/A-
PM:NRR CiDRP//7/. D:DRP~
-KDWeaver
. SJCampbell
LJSmith . KMKennedy- TAlexion
WDJohnson I BBeach
1/29/93'
1/29/93
1/29/93
2/03/93
-2/4/93'
2//{/93-
2/s/93
_
. , -
..
-
__
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _
_
. _ - _ _
e
.
~
Entergy Operations, Inc
-4-
ibccTtb'DMBL(IE01)?
'
bcc distrib. by RIV:
J. L. Milhoan
Resident inspector
Section Chief (DRP/A)
Lisa Shea, Rl/Alr, MS: MNBB 4503
MIS System
4
DRSS-FIPS
RIV File
Section Chief (DRP\\TSS)
Project Engineer (DRP/A)
_.
PE:D(RF/A#jgdh
RIV:EA:DRP/A Rl:DRP/A.
SRI:DR/A
PM:NRR C:DRP/
s.
D:DRP
KDWeaver
SJCampbell
LJSmith
KMKennedy TAlexion
WDJohnson
BBeach
1/29/93
1/29/93
1/29/93
2/03/93
2/4/93
2/f(/93
2/f/93
_ - _ _____ _ ____-____________-____-_______ ___ ______________ -_______________ - _ _-___ - - __-__ - ____ -