Forwards Insp Repts 50-440/85-39 & 50-441/85-17 on 850603-07 & 10-14.No Noncompliance Noted
ML20128G549
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/02/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20128G552 List:
References
NUDOCS 8507090234
Download: ML20128G549 (4)


See also: IR 05000440/1985039

Text

{{#Wiki_filter:-lfu -{E h rn G JUL 0 21985 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Mr. Murray R. Edelman- Vice President Nuclear Group Post' Office Box 5000 Cleveland, OH 44101 Gentlemen: - This refers to the routine safety inspection conducted by Mr. C. H. Scheibelhut of this office on June 3-7 and June 10-14, 1985, of activities at Perry Nuclear Power Plant, Units 1 and 2, authorized by Licenses No. CPPR-148 and No. CPPR-149 and to the discussion of our findings with Mr. Shuster at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. We will gladly discuss any questions you have concerning this inspection. Sincerely, " Original slyncJ Ly R. F. harn:c:;" R. F. Warnick, Chief Reactor Projects Branch 1 Enclosure: Inspection Report No. 50-440/85039(DRP); No. 50-441/85017(DRP) $707MkI p$U a l [ 1~tE 6 l . - - - - - -

JUL 0 21985 The Cleveland Electric Illuminating 2 Company See Attatched List For Distribution cc w/ enclosure: J. J. Waldron, Manager, Perry Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management Section DMB/ Document Control Desk (RIDS) Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq. James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health , r k 5 > RIII h RIII ' ' ' ' F R20 - ' Knop /jp Warnick , 07/02/85 q' ,

precg UNITED STATES 8 Og NUCLEAR REGULATORY COMMISSION

o ' REGION til E 'f 799 ROOSEVELT ROAD 0,

  • I

GLEN ELLYN, ILLINOIS 60137 %, .....f JUL 021985 Docket No. 50-440 ~- - Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Mr. Murray R. Edelman Vice President Nuclear Group , Post Office Box 5000 Cleveland, OH 44101 Gentlemen: This refers to the routine safety inspection conducted by Mr. C. H. Scheibelhut of this office on June 3-7 and June 10-14, 1985, of activities at Perry Nuclear Power Plant, Units 1 and 2, authorized by Licenses No. CPPR-148 and No. CPPR-149 and to the discussion of our -findings with Mr. Shuster at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during i the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. , No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. We will gladly discuss any questions you have concerning this inspection. ( Sincerely, ' i \\ , . . . , i /s /~'e . , s A R. F. Warnick, Chief { Reactor Projects Branch 1 1 Enclosure: Inspection Report No. 50-440/85039(DRP); No. 50-441/85017(DRP) f \\ 3 !

_ _ _ _ _ - _ _ _ _ _ _ _ - ____ _- - The Cleveland Electric Illuminating 2 JUL 0 21985 Company - - See Attatched List For Distribution ' ' . cc w/ enclosure: J. J. Waldron, Manager, Perry Plant Technical Department e M. D. Lyster, Manager, Perry Plant l Operations Department I - L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management Section DMB/ Document Control Desk (RIDS) Resident Inspector, RIII Harold W. Kohn,' Ohio EPA Terry J. Lodge, Esq. James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health ~ l s 1 s . l f ! ! < 1 . - - _ _ _ _ - _ _ _ _ _ }}