Text
s
.
JUL 2
1985
Docket No. 50-440
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
,
This refers to the routine safety inspection conducted by Mr. K. D. Ward of this
office on June 11-14, 1985, of activities at the Perry Nuclear Power Plant,
Unit 1, authorized by NRC Construction Permit No. CPPR-148, and to the
discussion of our findings with Mr. C. Shuster at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosure will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
--
Criginal Signed by J. C ifarrison
J. J. Harrison, Chief
Engineering Branch
8507090211 850702
$DR
ADOCK 05000440
1 (
%# 60 /
. .
t
The Cleveland Electric Illuminating
2
JUL 2
1985
Company
i
Enclosure:
Inspection
Report No. 50-440/85035(DRS)
cc w/ enclosure:
J. J. Waldron, Manager, Perry
Plant Technical Department
M. D. Lyster, Manager, Perry Plant
Operations Department
L. O. Beck, General Supervising
Engineer, Nuclear Licensing and
Fuel Management Section
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
RIII
RIII
RIII
RI I
on
Ha rison
-Spessard-
D)hc
Kn&o
,te
-
,
7
On0u85
!
.
'
UNITED STATES
[pn Kico"'c
NUCLEAR REGULATORY COMMISslON
+
[ }p
(
$
REGION itt
r
- ,
.
f
m nooscvett none
o
corn cueva. itunois som
g
....+
.
JUL R 1985
.
-
-
Docket No. 50-440
-
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
-
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward of this
office on June 11-14, 1985, of activities at the Perry Nuclear Power Plant,
Unit 1, authorized by NRC Construction Permit No. CPPR-148, and to the
discussion of our findings with Mr. C. Shuster at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosure will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. J. Harrison, Chief
Engineering Branch
1
..
.
The Cleveland Electric Illuminating
2
JUL 2
1985
Company
Enclosure:
Inspection
Report No. 50-440/85035(DRS)
cc w/ enclosure:
J. J. Waldron, Manager, Perry
Plant Technical Department
M. D. Lyster, Manager, Perry Plant
Operations Department
L. O. Beck, General Supervising
Engineer, Nuclear Licensing and
Fuel Management Section
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
.