k UNITED STATES g
,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066 Hoot
\\,*****/
UNION ELECTRIC COMPANY CALLAWAY PLANT. UNIT I i
DOCKET NO. 50-483 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.117 License No. NPF-30 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Union Electric Company (UE, the licensee) dated April 17, 1996, as supplemented by letters dated July 15,1996, July 31,1996, and August 28, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:
9610080310 961001 PDR ADOCK 05000483 P
_._._.. _ _ _ _ _.. ~. _. _. _ _ _. _ _. _ _
I 9
(2) Technical Specifications and Environmental Protection Plan 1
The Technical Specifications contained in Appendix A, as revised
[
i through Amendment No. 117 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
i The licensee shall operate the facility in accordance with the i
Technical Specifications and the Environmental Protection Plan.
l l
3.
Also, by Amendment No.117, the license is amended to authorize revision l
of the Final Safety Analysis Report (FSAR) as set-forth in the i
t application for amendment by Union Electric Company dated April 17, 1996, i
}
as supplemented by letters dated July 15, 1996, July 31, 1996, and i
i August 28, 1996. Union Electric Company shall update the FSAR to reflect the revised description authorized by this amendment in accordance with 10 CFR 50.71(e).
4.
This amendment is effective as of its date of issuance to be implemented t
prior to startup from the Callaway Plant Refuel 8.
FOR THE NUCLEAR REGULATORY COP #ilSSION l
h-hw Nkomew f
Kristine M. Thomas, Project Manager l
Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 1, 1996
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.117 TO FACILITY OPERATING LICENSE NO. NPF-30 DOCKET NO. 50-483 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.
REMOVE INSERT 3/4 3-16 3/4 3-16 3/4 3-17 3/4 3-17 3/4 3-21 3/4 3-21 3/4 3-21(a) 3/4 3-21(a) 3/4 3-24 3/4 3-24 3/4 3-35 3/4 3-35 l
r TABLE 3. 3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION nN 5
MINIMUM TOTAL NO.
CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION Ea 3.
Containment isolation w
a.
Phase "A" Isolation 1)
Manual Initiation 2
1 2
1, 2, 3, 4 18 2)
Automatic Actuation 2
1 2
1, 2, 3, 4 14 Logic and Actuation Relays (SSPS) 3)
Safety injection See Item 1. above for all Safety injection initiating functions and requirements.
s l
b.
Phase "6" Isolation
~1)
Manual Initiation 2 pair 1 pair 2 pair 1, 2, 3, 4 18 operated simultaneously 2)
Automatic Actuation 2
1 2
1, 2, 3, 4 14 Logic and Actuation Relays (SSPS) i 3)
Containment 4
2 3
1, 2, 3 16 Pressure-High-3 j
c.
Containment Purge Isolation j
1)
K a uni Initiation 2
1 2
1, 2, 3, 4 17 n.-
TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION 9
F MINIMUM E
TOTAL NO.
CHANNELS CHANNELS APPLICABLE 3E FUNCTIONAL UNIT OF CHANNELS TO TRIP _
OPERABLE MODES ACTION 3.
Containment Isolation (continued)
Q
- 2) Automatic Actuation 2
1 2
1, 2, 3, 4 17 Logic and Actuation Relays (SSPS)
- 3) Automatic Actuation 2
1 2
1, 2, 3, 4 17 Logic and Actuation Relays (BOP ESFAS)
- 4) Phase "A" Isolation See Item 3.a. for all Phase "A" Isolation initiating functions and requirements.
4.
Steam Line Isolation y
a.
Manual Initiation 1)
Individual 1/ steam line 1/ steam line 1/ operating 1, 2, 3 23 ca steam line g
- 2) System 2
1 2
1,2,3 22 b.
- 1) Automatic Actuation 2
1 2
1, 2, 3 34 l
[
Logic and Actuation Relays (SSPS)
[
- 2) Automatic Actuation 3/SSPS Train 2/SSPS Train 2/SSPS Train 1, 2, 3 34a Logic and Actuation p
Relays (MSFIS) c.
Containment Pressure-3 2
2 1, 2, 3 33*
4 l
High-2 i
d.
Steam Line 3/ steam line 2/ steam line 2/ steam line 1, 2, 3#
33*
i z
?
Pressure-Low any steam line t
g h
e.
Steam Line Pressure-3/ steam line 2/ steam line 2/ steam line 3##
33*
Negative Rate-High any steam line
.m y
-y n-w
TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION 9
F MINIMUM E
TOTAL NO.
CHANNELS CHANNELS APPLICABLE 5
FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION h
5.
Feedwater Isolation & Turbine Trip i
Z a.
- 1) Automatic Actuation 2
1 2
1, 2 27 l
Logic and Actuation Relays (SSPS)
- 2) Automatic Actuation 3/SSPS Train 2/SSPS Train 2/SSPS Train 1, 2 27a Logic and Actuation Relays (MSFIS) b.
Steam Generator Water 4/stm. gen.
2/stm. gen.
3/sta. gen.
1, 2 33*
Level High-High in any in each operating operating stm. gen.
stm. gen.
1 c.
Safety Injection See Item 1. above for all Safety Injection initiating functions and requirements.
w O
6.
Manual Initiation 3(1/ pump) 1/ pump 1/ pump 1, 2, 3 24 b.
Automatic Actuation 2
1 2
1,2,3 34 Logic and Actuation Relays (SSPS) c.
Automatic Actuation 2
1 2
1,2,3 21 F
Logic and Actuation
{
Steam Generator Water
[
Level Low-Low j
o t
(
- 1) Start Motor-Driven Pumps w
h a) Steam Generator 4/sta. gen.
2/sta. gen.
3/sta. gen.
1, 2, 3 33*, 35 i
C Water Level Low-in any in each I
y Low (Adve:se operating operating Containment stm. gen.
stm. gen.
Environment)
{
m
1 TABLE 3.3-3 (Continued)
ENGINEERED S4FETY FEATURES. ACTUATION SYSTEM INSTRUMENTATION nM E
MINIMUM E
TOTAL NO.
CllANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ArTION C
E 6.
Auxiliary Feedwater (Continued) y d.
Steam Generator Water Level Low-Low (Continued)
- 1) Start Motor-Driven Pumps (Continued) b) Steam Generator Water 4/stm. gen.
2/stm. gen.
3/stm. gen.
1, 2, 3 35, 36*
Level Low-Low in any oper-in each (Normal Containment ating stm.
operating Environment) gen.
stm. gen.
i, 4
c) Vessel AT (Power-1, 4
2 3
1,2,3 37*
y Power-2) m d) Containment Pressure-4 2
3 1,2,3 37*
Environmental Allowance Modifier
- 2) Start Turbine-Driven l
g Pump l
l a) Steam Generator Water 4/stm. gen.
2/stm. gen.
3/stm. gen.
1, 2, 3 33*, 35 l
Level Low-Low in any oper-in each (Adverse Containment ating stm.
Operating l
g Environment) gen.
stm. gen.
g b) Steam Generator kater 4/stm. gen.
2/stm. gen.
3/sts. gen.
1, 2, 3 35, 36*
Level Low-Low in any oper-in each D
(Normal Containment ating stm.
operating Environment) gen.
stm. gen.
m
^
c) Vessel AT (Power-1, 4
2 3
1,2,3 37*
Power-2)
TABLE 3.3-3 (continued)
ACTION STATEMENTS (continued)
ACTION 25
- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, declare the affected diesel generator and off-site power source inoperable and take the ACTION required by Specification 3.8.1.1 or 3.8.1.2.
ACTION 26 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or initiate and maintain operation of the Control Room Emergency Ventilation System.
ACTION 27 With the number of OPERABLE channels one less than the Minimum i
Channels OPERABLE requirement, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
j ACTION 27a - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed. The inoperable channel fails to a non-tripped condition. With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
One train may be placed in test for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other train is OPERABLE.
(NOTE: ACTION STATEMENTS 28 THROUGH 31 ARE LOCATED ON OTHER TABLES.)
CALLAWAY - UNIT 1 3/4 3-21 Amendment No. 64,85,117
e i
TABLE 3.3-3 (Continued)
ACTION STATEMENTS (Continued)
With the number of OPERABLE channels one less than the Total ACTION 32 Number of Channels, except for testing, STARTUP and/or POWER OPERATION may proceed for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided the following conditions are satisfied:
a.
The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and b.
The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.
Restore the inoperable channel to OPERABLE status within 72 i
hours or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With the number of OPERABLE channels one less than the Total Number of Channels due to testing of a channel, that channel may be tripped for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.
With the number of OPERABLE channels one less than the Total ACTION 33 Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
a.
The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,-and j
b.
The Minimum Channels OPERABLE requirement is met; however, j
the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.
With the number of OPERABLE channels one less than the Minimum ACTION 34 Channels OPERABLE requirement, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
With the number of OPERABLE channels one less than the Total ACTION 34a Number of Channels, operation may proceed. The inoperable channel fails to a non-tripped condition. With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. One train may be placed in test for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other train is t
With an inoperable delay timer in the Trip Time Delay ACTION 35 circuitry, STARTUP and/or POWER OPERATION may proceed provided that the Vessel AT (Power-1, Power-2) channels in the affected protection sets are placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
CALLAWAY - UNIT 1 3/4 3-21(a)
Amendment No. 4h64,117
.