ML20128F089

From kanterella
Jump to navigation Jump to search
Forwards 850315 Civil Penalty Package of Kewaunee Nuclear Plant to Demonstrate 840308 Enforcement Policy Re Full Mitigation of Civil Penalty on Basis of Prior Good Performance.Wisconsin Public Svc Co Presentation Encl
ML20128F089
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/01/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8507080116
Download: ML20128F089 (2)


Text

-

DMS s

jul 0 1 1396 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

The March 8, 1984 revision to the NRC Enforcement Policy introduced a means of recognizing good licensee performance by providing for full mitigation of a civil penalty based on prior good performance in the general area of concern.

One of the cases where this option was exercised by NRC involved the Kewaunee Nuclear Plant.

I thought it would be informative to provide you with a copy of that NRC enforcement package so you could review our application of this aspect of the enforcement policy.

Secondly, I was particularly impressed with the quality of the presentation by Wisconsin Public Service management during the Enforcement Conference with regard to this issue. The presentation reflected an indepth analysis of the event, an assessment of safety significance and a clear description of corrective actions which were very useful for me and my staff in reviewing this case. With the approval of Wisconsin Public Service Company, I am also enclosing a copy of that presentation for your information.

I would hope that the provision in the Enforcement Policy to mitigate certain civil per.alties based on good performance would be an incentive to strive for excellence of performance at your facilities.

Originni signed by Jarcs G. Neppler James G. Keppler Regional Administrator

Enclosures:

1.

Kewaunee Civil Penalty Package dtd 03/15/85 2.

Wisconsin Public Service Presentation and Attachments See Attached List For Distribution 8507000116 850701 PM ADOCK 05000264 f(c7 G

pg

O Wisconsin Electric Power Company 2

JUL C)1 t)85 Distribution cc w/ enclosures:

J. M. Taylor, Director, Office of Inspection and Enforcement J. J. Zach, Plant Manager DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII John J. Duffy, Chief Boiler Section l

Ness Flores, Chairperson Wisconsin Public Service Commission d

I 4

l t

i RIII RIII RII r

RIII RIII Mfh MMk V 4 d

/>

i l

Jackiw/rr

/Shafer Norelibs son D vis K

1r 9

06/18/85 ft

/f b II/II L' -